<ITEMS>
  <ITEM>
    <ID>1340</ID>
    <ProjectName>Allen Farm                                                                                          </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Nelson Mechanical Design                                                                            </Developer>
    <City>Martha's Vineyard                                 </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>.9 MW                                             </TotalSizeOLD>
    <TotalSize>900.000000</TotalSize>
    <TechnologyDescription>.9 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.3468</Latitude>
    <Longitude>-70.7226</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1377</ID>
    <ProjectName>Anderson Cranberries                                                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>CCI/Jim Sweeney                                                                                     </Developer>
    <City>Plymouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion />
    <LastUpdated>2010-10-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.8314</Latitude>
    <Longitude>-70.5595</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1312</ID>
    <ProjectName>Aquacultural Research Corp of Dennis                                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewables                                                                                   </Developer>
    <City>Dennis                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>600 kW                                            </TotalSizeOLD>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>600 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt; On September 28, 2010, the Dennis, MA Old King's Highway Commissioners voted to support an appeal made by a neighbor of the proposed 600-kW Aquacultural Research Corporation wind turbine project on the grounds that the turbine would affect the neighbor's view, rejecting the project. The Aquaculture Research Corp. decided on October 27, 2010 to file an appeal in Orleans District Court and will ask the judge to set aside the Old King's Highway Regional Historic District Commission's annulment of the Dennis OKH committee's decision.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.7288</Latitude>
    <Longitude>-70.2321</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>208</ID>
    <ProjectName>Bartlett Farm                                                                                       </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Lighthouse Electrical                                                                               </Developer>
    <City>Nantucket                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>250 kW                                            </TotalSizeOLD>
    <TotalSize>250.000000</TotalSize>
    <TechnologyDescription>1 Wind Energy Solutions 250 kW Turbine                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2008-07-02T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt; As of the end of March 2009, the 250 kW wind turbine at Bartlett Farm has been operational. &lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-31T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.2569</Latitude>
    <Longitude>-70.1340</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1337</ID>
    <ProjectName>Bay Path Regional Vocational Technical High School                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Charlton                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.2 MW                                            </TotalSizeOLD>
    <TotalSize>1200.000000</TotalSize>
    <TechnologyDescription>1.2 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.1328</Latitude>
    <Longitude>-71.9539</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>7</ID>
    <ProjectName>Beaulieu Wind Turbine                                                                               </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host>Fuel Service Station                                                                                </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Madawaska                                         </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>50 kW                                             </TotalSizeOLD>
    <TotalSize>50.000000</TotalSize>
    <TechnologyDescription>1 Atlantic Orient @ 50 kW                                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Small Wind (&lt;100 kW)                              </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>1999-07-02T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;Project is located in downtown urban setting.  Tower height is 100 feet. The turbine has been operating since November 1999.&lt;/p&gt;</Discussion>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>46.8842</Latitude>
    <Longitude>-67.9472</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>50</ID>
    <ProjectName>Beaver Ridge Wind Project                                                                           </ProjectName>
    <OwnerOperator>Patriot Renewables, LLC                                                                             </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>MIRSAP1 and Patriot Renewables, LLC                                                                 </Developer>
    <City>Freedom                                           </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>4.5 MW                                            </TotalSizeOLD>
    <TotalSize>4500.000000</TotalSize>
    <TechnologyDescription>4.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2008-11-01T00:00:00-06:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.energymaine.com/brwind/index.html"&gt;Competitive Energy Services&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           </AdditionalResources>
    <Discussion>&lt;p&gt;The Beaver Ridge Wind Project began commercial operation on November 1, 2008.  In late, 2007, Patriot Renewables (a wind development group owned by Boston construction contractor Jay Cashman) acquired a majority interest in the project and completed the final development, design, and construction of the 4.5-MW project.&lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-05T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.5302</Latitude>
    <Longitude>-69.2977</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1307</ID>
    <ProjectName>Berkshire East Ski Resort                                                                           </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Charlemont                                        </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>.9 MW                                             </TotalSizeOLD>
    <TotalSize>900.000000</TotalSize>
    <TechnologyDescription>.9 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <Discussion>&lt;p&gt;The 900-kW Berkshire East wind turbine, at the top of the Berkshire East ski mountain in Western, Massachusetts, was completed in December 2010 and is now operational. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.6139</Latitude>
    <Longitude>-72.8686</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>10</ID>
    <ProjectName>Berkshire Wind Power                                                                                </ProjectName>
    <OwnerOperator>Massachusetts Municipal Light Department Wind Energy Cooperative                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Distributed Generation Systems, Inc. (DISGEN)                                                       </Developer>
    <Address>Brodie Mountain                                                                                     </Address>
    <City>Hancock                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>15 MW                                             </TotalSizeOLD>
    <TotalSize>15000.000000</TotalSize>
    <TechnologyDescription>15 MW, 10 x 1.5 MW turbines                                                                                                                                                                                                                                    </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Construction                                      </Status>
    <Discussion>&lt;p&gt;On June 12, 2008, Distributed Generation Systems, Inc. and the Massachusetts Municipal Wholesale Electric Company (MMWEC) achieved financial closing for MMWEC's $4-million acquisition of the Berkshire Wind Project in Hancock. Since the neighboring condominium developer Silverleaf Resorts' settled their public nuisance lawsuit, MMWEC has re-started construction on the 15-MW wind project and aims to have it operational by mid-2011.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.5657</Latitude>
    <Longitude>-73.2750</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1310</ID>
    <ProjectName>Big Apple Farm                                                                                      </ProjectName>
    <OwnerOperator>Big Apple Farm                                                                                      </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Wrentham                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.0401</Latitude>
    <Longitude>-71.4032</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>49</ID>
    <ProjectName>Bog Wind Power Project                                                                              </ProjectName>
    <OwnerOperator>TBD                                                                                                 </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Beaufort Wind Power                                                                                 </Developer>
    <City>Wareham                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>10-16 MW                                          </TotalSizeOLD>
    <TotalSize>13000.000000</TotalSize>
    <TechnologyDescription>10-16 MW                                                                                                                                                                                                                                                       </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt; Local cranberry growers have partnered with Beaufort Windpower to develop the Bog Wind Power Project.  By erecting one or two turbines scattered about several of the region's oldest cranberry bogs, Beaufort Windpower and the cranberry growers hope to install a total of 10 to 16 MW of wind turbines as well as generate additional income for the farmers.  The project developer is currently collecting wind data.  Commercial operation is not expected before 2010.&lt;/p&gt;</Discussion>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.8407</Latitude>
    <Longitude>-70.6716</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1244</ID>
    <ProjectName>Bolton Valley Ski Resort                                                                            </ProjectName>
    <OwnerOperator>Bolton Valley Ski Resort                                                                            </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Alteris Renewables                                                                                  </Developer>
    <City>Bolton Valley                                     </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-11-12T00:00:00-07:00</CommissionDate>
    <Discussion>&lt;p&gt;In November 2009, Bolton Valley completed its 100-kW wind turbine with its developer, Atleris Renewables. Made by Vermont manufacturer Northern Power systems, the project is the first 100-kW turbine to be installed in Vermont. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-03-31T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.4200</Latitude>
    <Longitude>-72.8478</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1291</ID>
    <ProjectName>Bolton Valley Ski Resort - Expansion                                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Mountain Operations &amp; Development, LLC                                                              </Developer>
    <City>Bolton                                            </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.8 MW                                            </TotalSizeOLD>
    <TotalSize>1800.000000</TotalSize>
    <TechnologyDescription>1.8 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.4142</Latitude>
    <Longitude>-72.8179</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1317</ID>
    <ProjectName>Bourne National Cemetery                                                                            </ProjectName>
    <OwnerOperator>Department of Veterans Affairs                                                                      </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewables                                                                                   </Developer>
    <City>Bourne                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Construction                                      </Status>
    <Discussion />
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6762</Latitude>
    <Longitude>-70.5831</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1378</ID>
    <ProjectName>Bowers Mountain                                                                                     </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>First Wind                                                                                          </Developer>
    <City>Carroll Plantation                                </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TechnologyDescription>Unknown project size                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt;On December 1, 2010 the Maine Land Use Regulation Commission (LURC) approved the reclassification of nearly 700 acres of Washington County timberland as a expedited permitting zone for industrial wind-site development, clearing the way for the proposed Bowers Mountain wind farm in Kossuth Township. The zoning expansion will allow the developer to expand the footprint of an already designated expedited wind area of about 100 acres in Carroll Plantation, in Penobscot County. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>45.4145</Latitude>
    <Longitude>-68.0379</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1379</ID>
    <ProjectName>Bull Hill                                                                                           </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>First Wind                                                                                          </Developer>
    <City>Eastbrook                                         </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSize>75000.000000</TotalSize>
    <TechnologyDescription>~75 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt;The Bull Hill Wind Farm is currently seeking permits and throughout November and December of 2010, town officials from Eastbrook, Maine have been discussing a proposed wind ordinance, which would set construction and operating standards for the portion of the project that would be in Eastbrook. Construction and operation of the other part of the facility, which would be in neighboring Township 16, will be regulated by the state Land Use Regulation Commission (LURC). &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.6786</Latitude>
    <Longitude>-68.2648</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>5</ID>
    <ProjectName>Burlington Electric Department Wind Turbine                                                         </ProjectName>
    <OwnerOperator>Burlington Electric Department                                                                      </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Burlington                                        </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>50 kW                                             </TotalSizeOLD>
    <TotalSize>50.000000</TotalSize>
    <TechnologyDescription>1 Atlantic Orient @ 50 kW                                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Small Wind (&lt;100 kW)                              </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2000-07-02T00:00:00-06:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.burlingtonelectric.com/PhotoGallery/wind/wind1.html "&gt;Pictures&lt;/a&gt; and &lt;a href=" http://www.burlingtonelectric.com/PhotoGallery/wind/wind2.html"&gt;more pictures&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.burlingtonelectric.com/SpecialTopics/wingeneration.htm"&gt;Fact Sheet&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      </AdditionalResources>
    <Discussion>&lt;p&gt;This turbine has been operating since May 2000.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/5_burlingtont.jpg                                            </Photo1>
    <Photo1Alt>Photo of a wind turbine. Photo courtesy of Burlington Electric Department.                                                                                                                                                                                                                                  </Photo1Alt>
    <Photo1Caption>Wind Turbine at Burlington Electric Department Offices, Burlington, VT, April 2000.                                                                                                                                                                                                                         </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/5_burlington.jpg                                             </Photo1Link>
    <Photo1Width>148 </Photo1Width>
    <Photo1Height>200 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.4644</Latitude>
    <Longitude>-73.2151</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>27</ID>
    <ProjectName>Butterworks Farm                                                                                    </ProjectName>
    <OwnerOperator>Jack and Ann Lazor                                                                                  </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Westfield                                         </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>40 kW                                             </TotalSizeOLD>
    <TotalSize>40.000000</TotalSize>
    <TechnologyDescription>40 kW Refurbished Vestas turbine                                                                                                                                                                                                                               </TechnologyDescription>
    <ProjectType>Small Wind (&lt;100 kW)                              </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2003-07-02T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;This turbine was funded in part with the Jeffords grant, which also helped fund a number of other small (&lt;30 kW) installations in Vermont.&lt;/p&gt;</Discussion>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.8440</Latitude>
    <Longitude>-72.4538</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1380</ID>
    <ProjectName>Camden Hills Regional School                                                                        </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Rockport                                          </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>100 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-10-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.1901</Latitude>
    <Longitude>-69.1002</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1329</ID>
    <ProjectName>Camelot Wind                                                                                        </ProjectName>
    <OwnerOperator>Camelot Wind                                                                                        </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Atlantic Design Engineers                                                                           </Developer>
    <City>Plymouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.65 MW                                           </TotalSizeOLD>
    <TotalSize>1650.000000</TotalSize>
    <TechnologyDescription>1 AAER 1.65 MW Turbine                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.9242</Latitude>
    <Longitude>-70.6503</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1305</ID>
    <ProjectName>Canton Mountain Wind                                                                                </ProjectName>
    <ProjectNameURL>http://www.patriotrenewables.com                                                                                                                                                                                                                               </ProjectNameURL>
    <OwnerOperator>Canton Mountain Wind, LLC                                                                           </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Patriot Renewables                                                                                  </Developer>
    <City>Canton                                            </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSize>22000.000000</TotalSize>
    <TechnologyDescription>8 GE 2.75-103, 2.75-MW turbines                                                                                                                                                                                                                                </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt;Permit applications submitted December 2011.&lt;/p&gt;</Discussion>
    <LastUpdated>2012-01-30T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.5081</Latitude>
    <Longitude>-70.3165</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1311</ID>
    <ProjectName>Cape Cod Academy                                                                                    </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Osterville                                        </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6410</Latitude>
    <Longitude>-70.3900</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1381</ID>
    <ProjectName>Cape Cod Regional Transit Authority (CCTRA) Wind                                                    </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Development                                                                      </Developer>
    <City>South Dennis                                      </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Construction                                      </Status>
    <Discussion>&lt;p&gt;The 100-kW Northwind 100 turbine was installed in December 2010, and has been undergoing commissioning. The turbine will be operational in early 2011 &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6904</Latitude>
    <Longitude>-70.1420</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>15</ID>
    <ProjectName>Cape Wind                                                                                           </ProjectName>
    <OwnerOperator>Cape Wind Associates LLC                                                                            </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Energy Management Inc. (EMI)                                                                        </Developer>
    <City>Nantucket Sound                                   </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>468 MW                                            </TotalSizeOLD>
    <TotalSize>468000.000000</TotalSize>
    <TechnologyDescription>468 MW, 130 x Siemens 3.6  MW                                                                                                                                                                                                                                  </TechnologyDescription>
    <ProjectType>Offshore                                          </ProjectType>
    <Status>Permitted                                         </Status>
    <AdditionalResources>&lt;p&gt;Location of Nantucket Sound, off the shore of Massachusetts (&lt;a href="http://www.mtpc.org/offshore/Appendices/LocationMap.pdf"&gt;PDF 100 KB&lt;/a&gt;)  &lt;a href="http://www.adobe.com/products/acrobat/readstep2.html"&gt;Download Adobe Reader&lt;/a&gt;.&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.capewind.org/"&gt;Cape Wind&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.mtpc.org/renewableenergy/owec.htm"&gt;Offshore Wind Energy Collaborative&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.nae.usace.army.mil/projects/ma/ccwf/windfarm.htm"&gt;Cape Wind permit application&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.mms.gov/offshore/"&gt;Draft Environmental Impact Statement&lt;/a&gt;         &lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                 </AdditionalResources>
    <Discussion>&lt;p&gt; The 468-MW Cape Wind Project proposed for Nantucket Sound continues to seek permits. In July of 2008 the Energy Facilities Siting Board (EFSB) exercised its jurisdiction over local entities like the Cape Cod Commission to grant "all individual permits, approvals, or authorizations . . .necessary for the construction and operation" of a proposed energy facility if it is in the interest of the Commonwealth. As such, the EFSB has effectively overruled the Cape Cod Commission's previous transmission line building permit denial. Evidentiary proceedings for this process took place in October of 2008. More recently, in December 2008, The Massachusetts Department of Environmental Protection (DEP) approved Cape Wind's Chapter 91 waterways application. The Federal Mineral Management Service (MMS) released its Final Environmental Impact Statement (FEIS) in January 2009 deeming the project environmentally sound. The MMS Record of Decision on granting a lease to the project developers could come within 30 days of the FEIS release.  Barring any legal action from opponents of the project, Cape Wind Associates expect to finish permitting by March 2009 with construction to begin shortly after.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/15_capewindt.jpg                                             </Photo1>
    <Photo1Alt>A photo simulation of wind turbines off the coast.                                                                                                                                                                                                                                                          </Photo1Alt>
    <Photo1Caption>Photo Simulation of view from Craigville Beach, Centerville, 6.5 miles from wind farm.                                                                                                                                                                                                                      </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/15_capewind.jpg                                              </Photo1Link>
    <Photo1Width>300 </Photo1Width>
    <Photo1Height>199 </Photo1Height>
    <LastUpdated>2009-03-19T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.4782</Latitude>
    <Longitude>-70.2526</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Permitted                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1288</ID>
    <ProjectName>Casella Coventry Wind Project                                                                       </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Coventry                                          </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>2.2 MW                                            </TotalSizeOLD>
    <TotalSize>2200.000000</TotalSize>
    <TechnologyDescription>2.2 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.9122</Latitude>
    <Longitude>-72.2211</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1325</ID>
    <ProjectName>Centerville-Osterville-Marston Mills C-O-MM                                                         </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewables                                                                                   </Developer>
    <City>Marston Mills                                     </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>.9 MW                                             </TotalSizeOLD>
    <TotalSize>900.000000</TotalSize>
    <TechnologyDescription>.9 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6538</Latitude>
    <Longitude>-70.4284</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1309</ID>
    <ProjectName>City of Boston - Moon Island                                                                        </ProjectName>
    <OwnerOperator>City of Boston                                                                                      </OwnerOperator>
    <Host>City of Boston                                                                                      </Host>
    <Developer>Weston &amp; Samson                                                                                     </Developer>
    <City>Quincy                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.65 MW                                           </TotalSizeOLD>
    <TotalSize>1650.000000</TotalSize>
    <TechnologyDescription>1.65 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-29T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.3058</Latitude>
    <Longitude>-70.9909</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>198</ID>
    <ProjectName>City of Medford                                                                                     </ProjectName>
    <OwnerOperator>Community                                                                                           </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Medford                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-02-05T00:00:00-07:00</CommissionDate>
    <Discussion>&lt;p&gt;The City of Medford held a dedication ceremony on January 29, 2009 for its newly constructed and operational Northwind 100-kW wind turbine.&lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-05T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.4092</Latitude>
    <Longitude>-71.0995</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1306</ID>
    <ProjectName>Colony Place                                                                                        </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Plymouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.65 MW                                           </TotalSizeOLD>
    <TotalSize>1650.000000</TotalSize>
    <TechnologyDescription>1.65 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt;The Plymouth Planning Board has been considering a proposal by Colony Place Development LLC to build a 65-meter-tall wind turbine at Colony Place.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.9540</Latitude>
    <Longitude>-70.7114</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>44</ID>
    <ProjectName>Deep Water Phase II                                                                                 </ProjectName>
    <OwnerOperator>Deepwater Wind                                                                                      </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Phase 2 - Federal Waters                                                                            </Developer>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSize>1000000.000000</TotalSize>
    <TechnologyDescription>1,000 MW                                                                                                                                                                                                                                                       </TechnologyDescription>
    <ProjectType>Offshore                                          </ProjectType>
    <Status>In Development                                    </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://dwwind.com/"&gt;Deepwater Wind&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  </AdditionalResources>
    <Discussion>&lt;p&gt;On September 25, 2008, Governor Carcieri announced that Deepwater Wind was chosen as the developer to construct Rhode Island's first offshore wind farm. The project will be completed in two stages with the first part to be sited in state waters and the second stage to take place in federal waters. The second phase, will follow after the first phase, the New Shoreham Offshore Wind Project. Deepwater is focusing on developing that first phase for the time being, but anticipates that Phase 2 would follow within 2 years of Phase 1.  On October 27, 2010, Deepwater submitted an application to the Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) to lease a 270-square-mile area between Rhode Island and Massachusetts in order to build the expanded version of their second phase, a 200-turbine, 1,000-MW project in Rhode Island Sound&amp;mdash;dubbed the Deepwater Wind Energy Center&amp;mdash;which replaces (or, expands upon) the previously proposed 350-MW, 100-turbine proposal. Under the new proposal, Deepwater would also build an undersea transmission network that would stretch from Massachusetts to New York and interconnect to multiple states, allowing the plant to access a variety of markets.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-06-28T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.1408</Latitude>
    <Longitude>-71.2512</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1242</ID>
    <ProjectName>Deer Island Wind                                                                                    </ProjectName>
    <OwnerOperator>Massachusetts Water Resource Authority                                                              </OwnerOperator>
    <Host>Massachusetts Water Resource Authority                                                              </Host>
    <Developer>Lumus Construction                                                                                  </Developer>
    <City>Winthrop                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.2 MW                                            </TotalSizeOLD>
    <TotalSize>1200.000000</TotalSize>
    <TechnologyDescription>1.2 MW, 2x600 kW Elecon T600 Turbines on 35 M Towers                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-09-01T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt; In 2009, the Massachusetts Water Resource Authority and its contractor, Lumus Construction of Woburn, Massachusetts, finished construction of 2, 600-kW Elecon wind turbines at its Deer Island Wastewater facility. The turbines add to Massachusetts Water Resource Authority's onsite generation, including solar power, anaerobic digestion, and a hydroelectric generator. The project is expected to produce more than 2,000 MWh of power per year, saving the Massachusetts Water Resource Authority more than $250,000 per year.&lt;/p&gt;</Discussion>
    <LastUpdated>2010-01-18T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.3446</Latitude>
    <Longitude>-70.9538</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>12</ID>
    <ProjectName>Deerfield Wind                                                                                      </ProjectName>
    <OwnerOperator>PPM Energy (an Iberdrola Company)                                                                   </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>PPM Energy &amp;mdash; acquired the site from enXco in early 2006.                                      </Developer>
    <City>Searsburg and Readsboro                           </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>30 to 45 MW                                       </TotalSizeOLD>
    <TotalSize>30000.000000</TotalSize>
    <TechnologyDescription>~30MW, 20-30 x 1.5 MW turbines                                                                                                                                                                                                                                 </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.searsburgwind.com/"&gt;Dearfield Wind&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.northeastwind.com/whatwevedone/searsburg.html"&gt;Searsburg Wind Energy Facility&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       </AdditionalResources>
    <Discussion>&lt;p&gt;On December 20, 2010, the U.S. Forest Service issued a Supplemental Draft Environmental Impact Statement (SDEIS) for Iberdrola's Deerfield Wind project in Readsboro, Vermont. The Forest Service stated it would accept public comments for 45 days after the release date. The project is also awaiting Public Service Board approval of the sale of the majority of power to Central Vermont Public Service Company. The project is expected to achieve commercial operation by the fourth quarter of 2012.&lt;/p&gt;&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/12_searsburgt.jpg                                            </Photo1>
    <Photo1Alt>A photographic simulation of wind turbines on a mountain ridge. Photo courtesty of enXco, Inc.                                                                                                                                                                                                              </Photo1Alt>
    <Photo1Caption>Photographic simulation of the Searsburg Expansion from Route 9 in Woodbury, VT.                                                                                                                                                                                                                            </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/12_searsburg.jpg                                             </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>133 </Photo1Height>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.8949</Latitude>
    <Longitude>-72.9773</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1382</ID>
    <ProjectName>Dennis Water District                                                                               </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewable Energy                                                                             </Developer>
    <City>Dennis                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSize>3000.000000</TotalSize>
    <TechnologyDescription>3 MW                                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion />
    <LastUpdated>2010-11-29T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6969</Latitude>
    <Longitude>-70.1430</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1345</ID>
    <ProjectName>Douglas Wood Renewable Energy Park                                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>American WindPro                                                                                    </Developer>
    <City>Douglas                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>27.5 MW                                           </TotalSizeOLD>
    <TotalSize>27500.000000</TotalSize>
    <TechnologyDescription>27.5 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt;The Douglas Woods Wind Project is in the process of doing a full Environmental Impact Review, which will take a fair amount of time. On August 13, 2010, the Massachusetts Department of Public Utilities (DPU) issued an Order of Dismissal Without Prejudice in the docket proceedings for NSTAR's filings for approval of a long-term contract with the Douglas Woods Wind Project. The DPU noted that while NSTAR executed a contract with the project before Massachusetts eliminated the provision that limited long-term contact offers to in-state renewable energy projects, the docket was filed well afterwards. Therefore, NSTAR must comply with the new regulations to consider projects from all over New England, and their filing for the Douglas Woods contract approval was dismissed without prejudice. NSTAR is now considering Douglas Woods' proposal side-by-side with proposals from numerous other projects in New England. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.0434</Latitude>
    <Longitude>-71.7918</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1285</ID>
    <ProjectName>Dynapower Expansion                                                                                 </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Burlington Properties                                                                               </Developer>
    <City>S. Burlington                                     </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>500 kW                                            </TotalSizeOLD>
    <TotalSize>500.000000</TotalSize>
    <TechnologyDescription>500 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.4424</Latitude>
    <Longitude>-73.1512</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>23</ID>
    <ProjectName>Dynapower Wind Turbine                                                                              </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host>Dynapower Corp.                                                                                     </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>S. Burlington                                     </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>50 kW                                             </TotalSizeOLD>
    <TotalSize>50.000000</TotalSize>
    <TechnologyDescription>1 Atlantic Orient @ 50 kW, second series                                                                                                                                                                                                                       </TechnologyDescription>
    <ProjectType>Small Wind (&lt;100 kW)                              </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>1995-07-02T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;Operating since February 1995, this turbine provides electricity to the Dynapower Corporation in a behind-the-meter configuration.  Received partial funding from the Department of Energy to test turbine controls components.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/23_dynapowert.jpg                                            </Photo1>
    <Photo1Alt>A photo of a wind turbine.                                                                                                                                                                                                                                                                                  </Photo1Alt>
    <Photo1Caption>Atlantic Orient AOC 50 kW wind turbine at Dynapower Corp. in South Burlington, Vermont.                                                                                                                                                                                                                     </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/23_dynapower.jpg                                             </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>150 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.4427</Latitude>
    <Longitude>-73.1518</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1293</ID>
    <ProjectName>East Mountain Project/East Haven Wind Farm                                                          </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>East Haven                                        </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>7.5 MW                                            </TotalSizeOLD>
    <TotalSize>7500.000000</TotalSize>
    <TechnologyDescription>7.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.6661</Latitude>
    <Longitude>-71.7717</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1295</ID>
    <ProjectName>Easton Pond Business Center                                                                         </ProjectName>
    <OwnerOperator>Easton Pond Business Center                                                                         </OwnerOperator>
    <Host>Easton Pond Business Center                                                                         </Host>
    <Developer>SGE/Northeast Engineers &amp; Consultants                                                               </Developer>
    <City>Middletown                                        </City>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-09-15T00:00:00-06:00</CommissionDate>
    <LastUpdated>2010-04-27T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.5020</Latitude>
    <Longitude>-71.2868</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1297</ID>
    <ProjectName>Eco-Industrial Park of RI                                                                           </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Tiverton                                          </City>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>24 MW                                             </TotalSizeOLD>
    <TotalSize>24000.000000</TotalSize>
    <TechnologyDescription>24 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6408</Latitude>
    <Longitude>-71.1876</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>14</ID>
    <ProjectName>Equinox Wind Farm                                                                                   </ProjectName>
    <OwnerOperator>TBD                                                                                                 </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Endless Energy Corp.                                                                                </Developer>
    <City>Little Equinox, Manchester                        </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>9 MW                                              </TotalSizeOLD>
    <TotalSize>9000.000000</TotalSize>
    <TechnologyDescription>9 MW, 5 x 1.8 MW turbines                                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.equinoxmountain.com/windmills/index.htm"&gt;Mount Equinox&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.endlessenergy.com/gallery/equinox/index.shtml"&gt;Equinox Vermont &amp;mdash; past and future&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.endlessenergy.com/equinox.shtml"&gt;Equinox Wind Farm&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     </AdditionalResources>
    <Discussion>&lt;p&gt;New project planned on the site of one of the first wind farms in the region.&lt;/p&gt;

&lt;p&gt;Burlington Electric Department plans to purchase power from the project, along with most of the Renewable Energy Credits. The project has not yet filed with the Vermont Public Service Board for its Certificate of Public Good. &lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/14_equinox.jpg                                               </Photo1>
    <Photo1Alt>A simulated view of three wind turbines on a mountain ridge. Photo courtesy of Endless Energy Corporation.                                                                                                                                                                                                  </Photo1Alt>
    <Photo1Caption>Simulated view looking across ridge toward new wind farm on Little Equinox Mountain, Manchester, Vermont.                                                                                                                                                                                                   </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/14_equinox.jpg                                               </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>199 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>43.1522</Latitude>
    <Longitude>-73.1217</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1323</ID>
    <ProjectName>Fairhaven Wastewater Treatment Facility                                                             </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>CCI Energy                                                                                          </Developer>
    <City>Fairhaven                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>3.3 MW                                            </TotalSizeOLD>
    <TotalSize>3300.000000</TotalSize>
    <TechnologyDescription>3.3 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt;Orleans' decision to forego the project is good news for the Town of Fairhaven, which is looking at installing a 3 MW, two-turbine installation at the town's Wastewater Treatment Facility.  The Massachusetts Technology Collaborative has agreed to redirect the two turbines previously dedicated to Orleans, subject to the project developer CCI Energy securing financial commitments.&lt;/p&gt;</Discussion>
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6380</Latitude>
    <Longitude>-70.8691</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1316</ID>
    <ProjectName>Falmouth Academy                                                                                    </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Falmouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.5609</Latitude>
    <Longitude>-70.6210</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1296</ID>
    <ProjectName>Fisherman's Memorial State Park                                                                     </ProjectName>
    <OwnerOperator>Rhode Island Department of Environmental Mangement                                                  </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Narragansett                                      </City>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.3805</Latitude>
    <Longitude>-71.4877</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>53</ID>
    <ProjectName>Forbes Park Wind Project                                                                            </ProjectName>
    <OwnerOperator>Forbes Park                                                                                         </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewable Energy Development/Forbes Park                                                     </Developer>
    <City>Chelsea                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>600 kW                                            </TotalSizeOLD>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>600 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-01-29T00:00:00-07:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="www.forbeslofts.com/gallery.htm"&gt;See wind turbine installation slide show&lt;/a&gt;.&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          </AdditionalResources>
    <Discussion>&lt;p&gt;Successfully installed a 600-kW turbine at a residential and commercial mixed-use community in Chelsea in March 2008.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/53_forbest.jpg                                               </Photo1>
    <Photo1Alt>A photo of a wind turbine.  Photo credit: Boreal Renewable Energy Development.                                                                                                                                                                                                                              </Photo1Alt>
    <Photo1Caption>A panoramic view of the nacelle for a 600 kW wind turbine being lifted atop the tower at Forbes Park in Chelsea, MA.  Inset: the installation complete! Photo credit: Boreal Renewable Energy Development.                                                                                                  </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/53_forbes.jpg                                                </Photo1Link>
    <Photo1Width>300 </Photo1Width>
    <Photo1Height>106 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.3999</Latitude>
    <Longitude>-71.0129</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1241</ID>
    <ProjectName>Fox Islands Wind                                                                                    </ProjectName>
    <OwnerOperator>Fox Islands Electric Cooperative                                                                    </OwnerOperator>
    <Host>Fox Islands Electric Cooperative                                                                    </Host>
    <Developer>Cianbro                                                                                             </Developer>
    <City>Vinalhaven                                        </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>4.5 MW                                            </TotalSizeOLD>
    <TotalSize>4500.000000</TotalSize>
    <TechnologyDescription>4.5 MW, 3 GE 1.5 MW Turbines                                                                                                                                                                                                                                   </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-10-17T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;The three GE 1.5-MW wind turbines on Vinalhaven Island in Maine that comprise the Fox Islands Wind Project have been the focus of a great deal of debate about acceptable sound levels for wind turbines. In September 2010, the Maine Department of Environmental Protection sent a consultant on wind turbine noise to assess the noise levels of the turbines. In a letter from the consultant to the DEP dated September 9, 2010 he opined that the meteorological and sound data indicates sound levels greater than applicable limits, and that substantial changes are recommended for nighttime operations, to limit sound levels to 45 dBA. Fox Islands Wind has stated that their consultants have reviewed the same noise analysis data and concluded that the sound levels are compliant with applicable standards. The DEP will decide how to interpret the consultant's analysis, and whether to take action to modify the nighttime operation of the turbines. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.0929</Latitude>
    <Longitude>-68.8667</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1289</ID>
    <ProjectName>Georgia Mountain Community Wind                                                                     </ProjectName>
    <ProjectNameURL>http://www.georgiamountainwind.com/                                                                                                                                                                                                                            </ProjectNameURL>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Harrison Family                                                                                     </Developer>
    <City>Milton                                            </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>12 MW                                             </TotalSizeOLD>
    <TotalSize>12000.000000</TotalSize>
    <TechnologyDescription>12 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Permitted                                         </Status>
    <Discussion>&lt;p&gt;The community-scale Georgia Mountain Project was permitted by August of 2010 after receiving its Section 248 Certificate of Public Good with conditions in June. The project is expected to be between 3-5 turbines though the actual size of the turbines is yet to be determined. The project is expected to be operational in 2011. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.6667</Latitude>
    <Longitude>-73.0706</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Permitted                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1322</ID>
    <ProjectName>Governor's Academy                                                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Newbury                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>600 kW                                            </TotalSizeOLD>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>600 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.7496</Latitude>
    <Longitude>-70.8987</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>37</ID>
    <ProjectName>Grandpa's Knob Windpark                                                                             </ProjectName>
    <OwnerOperator>Reunion Power                                                                                       </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Reunion Power                                                                                       </Developer>
    <City>West Rutland and Castleton                        </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>50 MW                                             </TotalSizeOLD>
    <TotalSize>50000.000000</TotalSize>
    <TechnologyDescription>~50 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.noblepower.com/our-projects/GrandpasKnob/index.html"&gt;Noble Environmental Power&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           </AdditionalResources>
    <Discussion>&lt;p&gt;In January 2007, Noble Environmental Power announced plans to develop 50 MW near Grandpa's Knob, on the border between West Rutland and Castleton.  Still in the early stages of project exploration, Noble is negotiating with local land owners for control of the proposed site. In December 2007, Noble received approval from the Public Service Board to install a meteorological tower and measure the on-site wind resource.&lt;/p&gt;</Discussion>
    <LastUpdated>2010-05-12T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>43.6570</Latitude>
    <Longitude>-73.0958</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1383</ID>
    <ProjectName>Grandview Farm Wind                                                                                 </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>BlueWave Capital, LLC                                                                               </Developer>
    <City>Derby Line                                        </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSize>2200.000000</TotalSize>
    <TechnologyDescription>2.2 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-10-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>45.0049</Latitude>
    <Longitude>-72.1015</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>39</ID>
    <ProjectName>Granite Reliable Power Windpark                                                                     </ProjectName>
    <OwnerOperator>Noble Environmental Power                                                                           </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Noble Environmental Power                                                                           </Developer>
    <City>Coos County                                       </City>
    <StateID>NH</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>99 MW                                             </TotalSizeOLD>
    <TotalSize>99000.000000</TotalSize>
    <TechnologyDescription>99 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Permitted                                         </Status>
    <Discussion>&lt;p&gt; In August of 2010, Noble Environmental Power's proposed 99-MW Granite Reliable Power Project completed all of its permitting. In December of 2010, Noble announced that it was selling its stake in the project to Brookfield Renewable Power. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.6957</Latitude>
    <Longitude>-71.3873</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Permitted                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1300</ID>
    <ProjectName>Groton                                                                                              </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Iberdrola                                                                                           </Developer>
    <City>Groton                                            </City>
    <StateID>NH</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>48 MW                                             </TotalSizeOLD>
    <TotalSize>48000.000000</TotalSize>
    <TechnologyDescription>48 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt; On December 14, 2010, the New Hampshire Site Evaluation Committee (SEC) issued an Order on Pending Motions and Further Procedural Order for Iberdrola's Groton Wind Project. The order revealed several late developments in the developer's proposal, including a new interconnection route and a step-up transformer station to accommodate the 115-kV interconnection. Due to these new developments the Subcommittee determined that it was in the public's interest to extend the adjudicatory hearings until April 26, 2011. The new deadline for the state to approve or deny the $110 million project along the Tenney and Fletcher mountain ridges is April 26. If the project is approved it is expected to achieve commercial operation around early 2012.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>43.7359</Latitude>
    <Longitude>-71.8004</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1286</ID>
    <ProjectName>Heritage Aviation at Burlington International Airport                                               </ProjectName>
    <OwnerOperator>Heritage Aviation                                                                                   </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Alteris Renewables                                                                                  </Developer>
    <City>South Burlington                                  </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems 100 kW Northwind                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-12-29T00:00:00-07:00</CommissionDate>
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.4640</Latitude>
    <Longitude>-73.1466</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>51</ID>
    <ProjectName>Highland Plantation Wind Project                                                                    </ProjectName>
    <OwnerOperator>TBD                                                                                                 </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Independence Wind                                                                                   </Developer>
    <City>Highland Plantation                               </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>130 MW                                            </TotalSizeOLD>
    <TotalSize>130000.000000</TotalSize>
    <TechnologyDescription>~130 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt; In late December 2010, Independence Wind, developer of the Highland Wind power project in Somerset County, Maine, filed a revised application with the Maine Land Use Regulation Commission (LURC), which reduces the total turbines from 48 to 39, and removes the turbines closest to the Appalachian Trail and the Bigelow Preserve. The filing of the revisions will restart the LURC process, which had been suspended. The commission has 30 days to deem the application complete, and if accepted, LURC will schedule a public hearing, likely in March or April, with a decision expected roughly nine months after.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>45.1027</Latitude>
    <Longitude>-70.0811</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>197</ID>
    <ProjectName>Holy Name Central Catholic Jr./Sr. High School                                                      </ProjectName>
    <ProjectNameURL>http://www.holyname.net/green/index.html                                                                                                                                                                                                                       </ProjectNameURL>
    <OwnerOperator>Holy Name Central Catholic Jr./Sr. High School                                                      </OwnerOperator>
    <Host>Holy Name Central Catholic Jr./Sr. High School                                                      </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <Address>144 Granite St.                                                                                     </Address>
    <City>Worcester                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <PostalCode>01604-4501</PostalCode>
    <TotalSizeOLD>.6 MW                                             </TotalSizeOLD>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>1 600 kW Vestas RRB                                                                                                                                                                                                                                            </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2008-10-15T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;Holy Name Catholic High School in Worcester has a fully operation 600-kW turbine on premises as of October 2008.&lt;/p&gt;</Discussion>
    <LastUpdated>2010-04-15T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.2410</Latitude>
    <Longitude>-71.7842</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>9</ID>
    <ProjectName>Hoosac Wind Energy Project                                                                          </ProjectName>
    <OwnerOperator>PPM Energy (an Iberdrola Company)                                                                   </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>PPM Energy &amp;mdash; acquired the site from enXco in early 2006.                                      </Developer>
    <City>Florida and Monroe                                </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>30 MW                                             </TotalSizeOLD>
    <TotalSize>30000.000000</TotalSize>
    <TechnologyDescription>30 MW, 20 x 1.5 MW turbines                                                                                                                                                                                                                                    </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Permitted                                         </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://masstech.org/cleanenergy/facilities/profiles/windhoosac.htm"&gt;Massachusetts Technology Collaborative&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          </AdditionalResources>
    <Discussion>&lt;p&gt;The Hoosac Wind Project was fully permitted by the end of 2010, and is expected to start construction in 2011 and achieve commercial operation by December of 2011. On August 13, the Massachusetts Department of Public Utilities (DPU) issued an Order of Dismissal Without Prejudice in the docket proceedings for NSTAR's filings for approval of a long-term contract with the Hoosac Wind Project. The DPU noted that while NSTAR executed a contract with the project before Massachusetts eliminated the provision that limited long-term contact offers to in-state renewable energy projects, the docket was filed well afterwards. Therefore, NSTAR must comply with the new regulations to consider projects from all over New England, and their filing for the Hoosac contract approval was dismissed without prejudice. NSTAR is now considering Hoosac's proposal side-by-side with proposals from numerous other projects in New England. &lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/9_hoosact.jpg                                                </Photo1>
    <Photo1Alt>A photographic simulation of wind turbines on a mountain ridge. Photo courtesy of enXco, Inc.                                                                                                                                                                                                               </Photo1Alt>
    <Photo1Caption>Photographic simulation of the Hoosac Wind Project, from Stamford, VT on Rt. 8, looking to the southeast, approximately 2 miles from the turbines.                                                                                                                                                          </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/9_hoosac.jpg                                                 </Photo1Link>
    <Photo1Width>300 </Photo1Width>
    <Photo1Height>146 </Photo1Height>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.7299</Latitude>
    <Longitude>-73.0237</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Permitted                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>2</ID>
    <ProjectName>Hull Wind #1                                                                                        </ProjectName>
    <OwnerOperator>Hull Municipal Light Plant                                                                          </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Hull                                              </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>660 kW                                            </TotalSizeOLD>
    <TotalSize>660.000000</TotalSize>
    <TechnologyDescription>1 @ 660 kW Vestas v-47                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2002-01-05T00:00:00-07:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.hullwind.org/"&gt;http://www.hullwind.org/&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;University of Massachusetts Renewable Energy Research Laboratory. "A Case Study on Community Wind Development (&lt;a href="http://www.ceere.org/rerl/about_wind/RERL_Case_Study_Hull_Wind_One.pdf"&gt;PDF 361 KB&lt;/a&gt;)&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        </AdditionalResources>
    <Discussion>&lt;p&gt;Operating since December 2001, this turbine represents a pioneering effort in community wind. Many communities throughout the region are seeking to replicate Hull's success. &lt;/p&gt;

&lt;p&gt;Hull &amp;#35;1 was so popular in the community that Hull &amp;#35;2, a 1.8-MW Vestas V-80 was installed in Spring 2006 (see &lt;a href="http://www.windpoweringamerica.gov/ne_project_detail.asp?id=20"&gt;Hull Wind 2&lt;/a&gt;). &lt;/p&gt;

&lt;p&gt;Perhaps the most visible wind turbine in the U.S.!&lt;/p&gt;

&lt;p&gt;Renewable Energy Credits from Hull &amp;#35;1 sold through &lt;a href="http://www.massenergy.com/Options.html"&gt;Mass Energy Consumers Alliance&lt;/a&gt;.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/2_Hull_wind1t.jpg                                            </Photo1>
    <Photo1Alt>Photo of a wind turbine. PIX 11261                                                                                                                                                                                                                                                                          </Photo1Alt>
    <Photo1Caption>Vestas turbine at Hull Municipal Lighting Plant, Hull, Massachusetts. This turbine provides enough electricity to power the street lights of Hull.                                                                                                                                                          </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/2_Hull_wind1.jpg                                             </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>159 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.3040</Latitude>
    <Longitude>-70.9214</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>20</ID>
    <ProjectName>Hull Wind #2                                                                                        </ProjectName>
    <OwnerOperator>Hull Municipal Light Plant                                                                          </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Hull                                              </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.8 MW                                            </TotalSizeOLD>
    <TotalSize>1800.000000</TotalSize>
    <TechnologyDescription>1.8 MW, Vestas V80                                                                                                                                                                                                                                             </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2006-05-01T00:00:00-06:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.hullwind.org/"&gt;Hull Wind&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 </AdditionalResources>
    <Discussion>&lt;p&gt;A sequel to Hull Wind #1, this installation was completed in the Spring of 2006 and is believed to be the first commercial scale wind turbine constructed on a landfill.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/20_hull2t.jpg                                                </Photo1>
    <Photo1Alt>A photo of a wind turbine. Photo courtesy of Sally Wright, Renewable Energy Research Laboratory, UMass Amherst                                                                                                                                                                                              </Photo1Alt>
    <Photo1Caption>Hull 2 on Hull, MA landfill.                                                                                                                                                                                                                                                                                </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/20_hull2.jpg                                                 </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>133 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.2611</Latitude>
    <Longitude>-70.8535</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>196</ID>
    <ProjectName>Hyannis Country Garden                                                                              </ProjectName>
    <OwnerOperator>Hyannis Country Garden                                                                              </OwnerOperator>
    <Host>Country Garden of Hyannis                                                                           </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Cape Cod                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2008-12-20T00:00:00-07:00</CommissionDate>
    <Discussion>&lt;p&gt;Country Garden of Hyannis (100 kW) began operation as of November 2008 making it the first community-scale wind turbine in Cape Cod. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-05-03T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6510</Latitude>
    <Longitude>-70.3106</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>22</ID>
    <ProjectName>IBEW                                                                                                </ProjectName>
    <OwnerOperator>International Brotherhood of Electrical Workers                                                     </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Solar Design Associates                                                                             </Developer>
    <City>Boston                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>Fuhrlander FL 100 kW                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2005-07-02T00:00:00-06:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.ibew103.com/node/605"&gt;International Brotherhood of Electrical Workers&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;IBEW 103's website has information on the project, as well as photographs of the site, photosimulations of the installation, and photos of the nacelle and towers as they arrive on site.&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.lorax-energy.com/serv02.htm"&gt;Lorax Energy Systems, LLC&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;The Boston Globe. (September 3, 2003). "&lt;a href="http://www.boston.com/business/globe/articles/2003/09/03/solar_power_surge?mode=PF"&gt;Solar Power Surge: Electricians aim to help push 'green' technology mainstream&lt;/a&gt;." &lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                  </AdditionalResources>
    <Discussion>&lt;p&gt;IBEW Local 103's Dorchester Training Center, 3 miles south of the center of Boston, MA (adjacent to I-93 South) &lt;/p&gt;

&lt;p&gt;The IBEW turbine was installed in Spring 2005. &lt;/p&gt;

&lt;p&gt;Interconnection: Grid Connected, behind the Meter. Funded in part by a grant from the Renewable Energy Trust. Will provide an advanced wind power training facility to the largest and most experienced electrical local in the state.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/22_ibewt.jpg                                                 </Photo1>
    <Photo1Alt>A collage of three photos taken from three different directions.                                                                                                                                                                                                                                            </Photo1Alt>
    <Photo1Caption>The 100 kW Fuhrl&amp;auml;nder wind turbine, located adjacent to IBEW local 103's headquarters in Dorchester, MA, can be seen clearly from the southeast expressway by thousands of commuters daily.                                                                                                            </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/22_ibew.jpg                                                  </Photo1Link>
    <Photo1Width>250 </Photo1Width>
    <Photo1Height>156 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.3048</Latitude>
    <Longitude>-71.0542</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>34</ID>
    <ProjectName>Jericho Mountain Wind                                                                               </ProjectName>
    <OwnerOperator>Loranger Power Generation                                                                           </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Loranger Power Generation                                                                           </Developer>
    <City>Berlin                                            </City>
    <StateID>NH</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.05 MW                                           </TotalSizeOLD>
    <TotalSize>1050.000000</TotalSize>
    <TechnologyDescription>1.05 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Operating                                         </Status>
    <Discussion>&lt;p&gt;In February 2006, Loranger Power Generation Corp. commenced operation of three out of the four 350-KW used wind turbines it imported from California.  In early July, however, the project was vandalized, and the cables used to raise and lower the turbines were severed, toppling and destroying one and severely damaging the other two.  The owner has indicated his intent to fix the turbines that were not destroyed.&lt;/p&gt;</Discussion>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.4613</Latitude>
    <Longitude>-71.2231</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>42</ID>
    <ProjectName>Jiminy Peak                                                                                         </ProjectName>
    <OwnerOperator>Jiminy Peak                                                                                         </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Jiminy Peak / Sustainable Energy Developments, Inc.                                                 </Developer>
    <City>Hancock                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2007-08-01T00:00:00-06:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://green.jiminypeak.com/page.php?PageID=295"&gt;Jiminy Peak Mountain Resort&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        </AdditionalResources>
    <Discussion>&lt;p&gt;Jiminy Peak Ski Resort became the first to integrate wind power into its energy strategy when it completed the installation of a GE 1.5 MW turbine at its Hancock facility in mid-July 2007.  The Resort dedicated the turbine in a public ceremony on August 15, 2007.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/42_jiminyt.jpg                                               </Photo1>
    <Photo1Alt>A photo of a crane lifting the wind turbine blades onto the nacelle. PIX15160                                                                                                                                                                                                                               </Photo1Alt>
    <Photo1Caption>Jiminy Peak Ski Area raises the rotor of its wind turbine in the Berkshire Mountains of Western Massachusetts.                                                                                                                                                                                              </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/42_jiminy.jpg                                                </Photo1Link>
    <Photo1Width>136 </Photo1Width>
    <Photo1Height>200 </Photo1Height>
    <LastUpdated>2008-01-08T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.5443</Latitude>
    <Longitude>-73.2916</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>31</ID>
    <ProjectName>Kibby Wind Power Project                                                                            </ProjectName>
    <OwnerOperator>TransCanada                                                                                         </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>TransCanada                                                                                         </Developer>
    <City>Kibby Mountain                                    </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>132 MW                                            </TotalSizeOLD>
    <TotalSize>132000.000000</TotalSize>
    <TechnologyDescription>132 MW, 44 Vestas V90 3.0 MW Turbines                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-10-16T00:00:00-06:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;Kibby Wind Power Project Fact Sheet (&lt;a href="http://www.transcanada.com/pdf/company/kibby_factsheet.pdf"&gt;PDF 461 KB&lt;/a&gt;) &lt;a href="http://www.adobe.com/products/acrobat/readstep2.html"&gt;Download Adobe Reader&lt;/a&gt;.&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              </AdditionalResources>
    <Discussion>&lt;p&gt; In August 2008, construction commenced at the 44 turbine, 132-MW Kibby Mountain Wind Project, proposed by TransCanada for Kibby and Skinner Townships in the Boundary Mountains.  The first 66-MW phase (comprised of 22, 3-MW turbines) was fully commissioned in October 2009.  The remaining 66 MW were completed and fully operational in November of 2010. Kibby Mountain is currently the largest wind project in New England.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.9673</Latitude>
    <Longitude>-70.7622</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1304</ID>
    <ProjectName>Kibby Wind Power Project Expansion, Sisk Mountain                                                   </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>TransCanada                                                                                         </Developer>
    <City>Chain of Ponds and Kibby Townships                </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>45 MW                                             </TotalSizeOLD>
    <TotalSize>33000.000000</TotalSize>
    <TechnologyDescription>33 MW, 11 Vestas V90 3-MW Turbines                                                                                                                                                                                                                             </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt;The Maine Land Use Regulatory Commission (LURC) met on January 5, 2011 and voted 5 - 1 to approve a permit for Transcanada's proposal to expand the Kibby Wind Project by 11 turbines, each with a capacity of 3 MW. The new turbines will be installed on the Sisk Mountain range in Franklin County. Supporters of the expansion included the Franklin County Commission, the Greater Franklin Development Corp., and the town of Eustis.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>45.3730</Latitude>
    <Longitude>-70.6581</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1284</ID>
    <ProjectName>Kingdom Community Wind                                                                              </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Green Mountain Power (GMP)                                                                          </Developer>
    <City>Lowell                                            </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>60-90 MW                                          </TotalSizeOLD>
    <TotalSize>63000.000000</TotalSize>
    <TechnologyDescription>21 turbines                                                                                                                                                                                                                                                    </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Construction                                      </Status>
    <AdditionalResources>Marketwire. "&lt;a href="http://www.marketwire.com/press-release/green-mountain-power-begins-construction-of-kingdom-community-wind-1557451.htm"&gt;Green Mountain Power Begins Construction of Kingdom Community Wind&lt;/a&gt;." (September 6, 2011).                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             </AdditionalResources>
    <Discussion>&lt;p&gt;In August of 2010, the Kingdom Community Wind Project filed for a Section 248 Certificate of Public Good from the Vermont Public Service Board. At a public hearing in September of 2010, testimony was submitted under oath, and by November the proceedings were in rebuttal testimony while hearings continued. A decision on the Certificate is expected by the spring of 2011.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-09-06T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.7498</Latitude>
    <Longitude>-72.4324</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1384</ID>
    <ProjectName>Klug Farm                                                                                           </ProjectName>
    <OwnerOperator>Optiwind                                                                                            </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Alteris Renewables                                                                                  </Developer>
    <City>Torrington                                        </City>
    <StateID>CT</StateID>
    <CountryID>US</CountryID>
    <TotalSize>150.000000</TotalSize>
    <TechnologyDescription>150 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Construction                                      </Status>
    <Discussion />
    <LastUpdated>2010-10-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.8130</Latitude>
    <Longitude>-73.1699</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>21</ID>
    <ProjectName>Lempster Wind Project                                                                               </ProjectName>
    <OwnerOperator>Iberdrola USA                                                                                       </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Community Energy, an Iberdrola Company                                                              </Developer>
    <City>Lempster                                          </City>
    <StateID>NH</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>24 MW                                             </TotalSizeOLD>
    <TotalSize>24000.000000</TotalSize>
    <TechnologyDescription>24 MW, 12 turbines at 2-MW each                                                                                                                                                                                                                                </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2008-11-15T00:00:00-07:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.newwindenergy.com/wind-farms/wind-farms-summary00/under-development-lempster/"&gt;Lempster Wind Farm&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        </AdditionalResources>
    <Discussion>&lt;p&gt;Iberdrola's 24-MW Lempster Wind Project began commercial operation in November 2008. The official ribbon-cutting ceremony is expected to take place in the Spring of 2009 after the completion of final site work and restoration. Public Service of New Hampshire is expected to buy 90 percent of the power generated from the project, with minority partner New Hampshire Electric Cooperative buying the remaining 10 percent&lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-05T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>43.2417</Latitude>
    <Longitude>-72.1437</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1385</ID>
    <ProjectName>Lightolier                                                                                          </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewables                                                                                   </Developer>
    <City>Fall River                                        </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Permitted                                         </Status>
    <Discussion />
    <LastUpdated>2010-11-29T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.7461</Latitude>
    <Longitude>-71.1162</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Permitted                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>194</ID>
    <ProjectName>Longfellow Windpark                                                                                 </ProjectName>
    <OwnerOperator>TBD                                                                                                 </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>First Wind                                                                                          </Developer>
    <City>Rumford                                           </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>50 MW                                             </TotalSizeOLD>
    <TotalSize>50000.000000</TotalSize>
    <TechnologyDescription>50 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt;The project is currently in advanced stages of development.&lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-05T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.5451</Latitude>
    <Longitude>-70.6056</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1318</ID>
    <ProjectName>Lynn Water and Sewer Commission                                                                     </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Camp Dresser and McKee                                                                              </Developer>
    <City>Lynn                                              </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>600 kW                                            </TotalSizeOLD>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>600 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt;In the City of Lynn, after an initial attempt to install a 1.5 MW turbine at the waste water treatment plant was turned down by the Federal Aviation Administration due to height issues, the city is intending to build a 600-kW turbine as early as 2010.&lt;/p&gt;&lt;p class='small'&gt;</Discussion>
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.4766</Latitude>
    <Longitude>-70.9689</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>8</ID>
    <ProjectName>Manchester/Hillsborough Wind Turbine                                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host>Private Residence                                                                                   </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Manchester/Hillsborough                           </City>
    <StateID>NH</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>50 kW                                             </TotalSizeOLD>
    <TotalSize>50.000000</TotalSize>
    <TechnologyDescription>1 Atlantic Orient @ 50 kW                                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Small Wind (&lt;100 kW)                              </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>1998-07-02T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;This turbine has been operating since November 1998.&lt;/p&gt;</Discussion>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.9911</Latitude>
    <Longitude>-71.4630</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>209</ID>
    <ProjectName>Mark Richey Woodworking                                                                             </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Merdian Associates                                                                                  </Developer>
    <City>Newburyport                                       </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>600 kW                                            </TotalSizeOLD>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>1 600 kW Elecon T600                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-02-22T00:00:00-07:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.markrichey.com/our_facility/wind-turbine-generator.cfm"&gt;Mark Richey Woodworking&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          </AdditionalResources>
    <Discussion>&lt;p&gt;Mark Richey Woodworking is currently operating a 600-kW installation.&lt;/p&gt;</Discussion>
    <LastUpdated>2010-05-05T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.8025</Latitude>
    <Longitude>-70.8796</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>13</ID>
    <ProjectName>Mars Hill Wind Farm                                                                                 </ProjectName>
    <OwnerOperator>Evergreen Wind Power, LLC                                                                           </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>UPC Wind Management, LLC                                                                            </Developer>
    <City>Mars Hill                                         </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>42 MW                                             </TotalSizeOLD>
    <TotalSize>42000.000000</TotalSize>
    <TechnologyDescription>42 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Operating                                         </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.nrcm.org/mars_hill.asp"&gt;Natural Resources Council of Maine&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               </AdditionalResources>
    <Discussion>&lt;p&gt;Project construction commenced in mid-2006 and the turbines were installed in December 2006 and January 2007.&lt;/p&gt;

&lt;p&gt;The project is located on a ridge with several cell towers and a small ski area.  While the project is located in the Northern Maine Independent System Administrator territory, most of its energy and Renewable Energy Certificates are being sold into ISO-New England territory for consumption by New England customers.&lt;/p&gt;

&lt;p&gt;Since the project began operating in early 2007, some of the nearest abutters have raised questions and concerns about turbine sound levels.  Project owner UPC Wind is conducting sound monitoring studies, the results of which are not yet available.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/13_evergreent.jpg                                            </Photo1>
    <Photo1Alt>A photo simulation of wind turbines on a mountain ridge. Photo courtesty of UPC Wind Management, LLC.                                                                                                                                                                                                       </Photo1Alt>
    <Photo1Caption>Photo Simulation of Evergreen Wind Power Project, Mars Hill, Maine, January 8, 2004.                                                                                                                                                                                                                        </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/13_evergreen.jpg                                             </Photo1Link>
    <Photo1Width>300 </Photo1Width>
    <Photo1Height>125 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>46.5567</Latitude>
    <Longitude>-67.8055</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1386</ID>
    <ProjectName>Mass Energy Aggregate Small Wind, net of IBEW                                                       </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Aggregate                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSize>535.900000</TotalSize>
    <TechnologyDescription>540 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2005-07-02T00:00:00-06:00</CommissionDate>
    <Discussion />
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1387</ID>
    <ProjectName>Mass Energy Aggregate Wind - Cape                                                                   </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Various                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSize>19.250000</TotalSize>
    <TechnologyDescription>20 kW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Small Wind (&lt;100 kW)                              </ProjectType>
    <Status>Operating                                         </Status>
    <Discussion />
    <LastUpdated>2010-10-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1331</ID>
    <ProjectName>Massachusetts Bay Transportation Authority (MBTA - Bridgewater)                                     </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Bridgewater                                       </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.9847</Latitude>
    <Longitude>-70.9638</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1314</ID>
    <ProjectName>Massachusetts Bay Transportation Authority, Kingston                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Kingston                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.9765</Latitude>
    <Longitude>-70.7230</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1333</ID>
    <ProjectName>Massachusetts Department of Corrections, Gardner                                                    </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Gardner                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>3.3 MW                                            </TotalSizeOLD>
    <TotalSize>3300.000000</TotalSize>
    <TechnologyDescription>3.3 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Construction                                      </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.5718</Latitude>
    <Longitude>-71.9443</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1332</ID>
    <ProjectName>Massachusetts Department of Corrections, Plymouth Sheriff                                           </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Plymouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>3 MW                                              </TotalSizeOLD>
    <TotalSize>3000.000000</TotalSize>
    <TechnologyDescription>3 MW                                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.9292</Latitude>
    <Longitude>-70.6581</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1341</ID>
    <ProjectName>Massachusetts Department of Corrections, Worcester County Sheriff                                   </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Worcester                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.3231</Latitude>
    <Longitude>-71.7684</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>35</ID>
    <ProjectName>Massachusetts Maritime Academy                                                                      </ProjectName>
    <OwnerOperator>Commonwealth of Massachusetts                                                                       </OwnerOperator>
    <Host>Massachusetts Maritime Academy                                                                      </Host>
    <Developer>Jay Cashman Inc. and Energy Management Inc.                                                         </Developer>
    <City>Bourne                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>660 kW                                            </TotalSizeOLD>
    <TotalSize>660.000000</TotalSize>
    <TechnologyDescription>1  Vestas v-47, 600 kW                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2006-05-01T00:00:00-06:00</CommissionDate>
    <Discussion />
    <Photo1>/newengland/images/thumbnails/projects/35_maritimet.jpg                                             </Photo1>
    <Photo1Alt>A photo of a wind turbine. Photo Credit: Bob Grace, Sustainable Energy Advantage, LLC.                                                                                                                                                                                                                      </Photo1Alt>
    <Photo1Caption>Massachusetts Maritime Academy's Vestas V-47 overlooks the school's football and baseball fields.                                                                                                                                                                                                           </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/35_maritime.jpg                                              </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>150 </Photo1Height>
    <LastUpdated>2010-03-17T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.7470</Latitude>
    <Longitude>-70.6241</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1239</ID>
    <ProjectName>Massachusetts Military Reservation - Air Force Center for Environmental Excellence                  </ProjectName>
    <OwnerOperator>Air Force Center for Environmental Excellence                                                       </OwnerOperator>
    <Host>Air Force Center for Environmental Excellence                                                       </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Bourne                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1 Furhlander 1.5 MW                                                                                                                                                                                                                                            </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-12-15T00:00:00-07:00</CommissionDate>
    <Discussion>&lt;p&gt; The Massachusetts Military Reservation (Otis Air Force Base) received and installed its 1.5-MW Fuhrlander turbine via the same shipment that carried Princeton Municipal Light Department's equipment for its 3-MW wind project.  As a result, Massachusetts Military Reservation also commissioned its single, 1.5-MW turbine in late Fall 2009. The turbine will partially power the Air Force's groundwater clean up efforts at the Base and is the first of a multi-phase wind development effort for the Reservation. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-01-19T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6578</Latitude>
    <Longitude>-70.5914</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1343</ID>
    <ProjectName>Massachusetts Military Reservation Phase 2                                                          </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Bourne                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>7.5 MW                                            </TotalSizeOLD>
    <TotalSize>7500.000000</TotalSize>
    <TechnologyDescription>7.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.7194</Latitude>
    <Longitude>-70.5491</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>205</ID>
    <ProjectName>Massachusetts Offshore Initiatives                                                                  </ProjectName>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <ProjectType>Offshore                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt;An early stage Massachusetts offshore initiative has recently been announced for Gray's Harbor (~1,000 MW).&lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-31T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>43</ID>
    <ProjectName>Massachusetts Planned Customer-Sited Wind Projects                                                  </ProjectName>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Planned                                           </Status>
    <Discussion>&lt;p&gt;Customer-sited wind projects in Massachusetts gained further traction with businesses and communities actively seeking to develop projects consisting of one or two commercial-scale wind turbines.&lt;/p&gt;
 
&lt;ul&gt; 

&lt;li&gt;&lt;h3&gt;Cape Cod Community College&lt;/h3&gt;
&lt;p&gt;Cape Cod Community College has issued a request for proposals for turbine procurement and is ready to initiate the construction process once the turbine has been purchased.  &lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Catamount Ski Area&lt;/h3&gt;
&lt;p&gt;Considering installing a turbine of 1 MW or less.&lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Falmouth Hospital&lt;/h3&gt;
&lt;p&gt;Plans to explore the feasibility of installing a utility-scale wind turbine (500kW to 2000 kW) on its campus in Falmouth.&lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Gloucester Office Building&lt;/h3&gt;
&lt;p&gt;Planning to install a 100-kW wind turbine.&lt;/p&gt;&lt;/li&gt;


&lt;li&gt;&lt;h3&gt;Housing Land Trust of Cape Cod (Barnstable)&lt;/h3&gt;
&lt;p&gt;Will use its feasibility study to analyze the technical and economic aspects of installing up to 250 kW of wind power at the 
site.&lt;/p&gt;&lt;/li&gt;


&lt;li&gt;&lt;h3&gt;&lt;a href="http://www.windpoweringamerica.gov/newengland/project_detail.asp?id=42"&gt;Jiminy Peak Ski 
Resort&lt;/a&gt;&lt;/h3&gt;
&lt;p&gt;Became the first to integrate wind power into its energy strategy when it completed the installation of a GE 1.5-MW turbine at 
its Hancock facility in mid-July 2007.  The Resort dedicated the turbine in a public ceremony on August 15th.&lt;/p&gt;&lt;/li&gt;


&lt;li&gt;&lt;h3&gt;MBTA&lt;/h3&gt;
&lt;p&gt;The MBTA is expecting to install a 1.5-MW project by 2010. &lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Manchester Athletic Club&lt;/h3&gt;
&lt;p&gt;The Manchester Athletic Club is currently assessing the feasibility of installing either a 600-kW or 1.5-MW turbine at its Manchester-by-the-Sea facility.  &lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Sandwich&lt;/h3&gt;
&lt;p&gt;A 3-MW project in Sandwich is expected to be operational in 2013.&lt;/p&gt;&lt;/li&gt;


&lt;li&gt;&lt;h3&gt;Staples in Framingham&lt;/h3&gt;
&lt;p&gt;The development at Staples in Framingham has recently been terminated due to insufficient wind speeds.  After receiving a design and construction grant from MTC. &lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Templeton Municipal Light &amp; Water Co.&lt;/h3&gt;
&lt;p&gt;The Templeton Municipal Light &amp;amp; Water Co., Ipswich Municipal Light Plant, and Berkshire Electric Cooperative collectively released a request for proposals for turbine procurement through MMWEC in August 2008. Results of the request for proposals for these three entities have not been announced yet. &lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Wampanoag Tribe of Gay Head&lt;/h3&gt;
&lt;p&gt;The Wampanoag Tribe of Gay Head is currently pursuing a 3.75-MW project in Aquinnah that has a target operational date of 2011. &lt;/p&gt;&lt;/li&gt;


&lt;/ul&gt;

&lt;p&gt;In January 2009, the Massachusetts Technology Collaborative announced its most recent grant recipients under the 6th (and possibly final) round of the Large On-Site Renewables Initiative (LORI).  LORI awards grant funding for either design and construction or feasibility studies.  Round 6 design and construction grant winners included four wind projects: shellfish cultivator and processor Aquacultural Research Corporation of Dennis (600 kW), Berkshire East Ski Resort of Charlemont (600 kW), MBTA's Kingston Station facility (100 kW), and Upper Cape Regional Technical High School in Bourne (2 MW).  Round 6 feasibility study grant winners included eleven wind projects: City of Boston: Moon Island (100 kW to 2 MW), the Town of Chatham (50 kW to 225 kW), the Town of Hamilton (600 kW to 1.5 MW), the Town of Mashpee (100 kW to 2 MW), Masonic Health System in Charlton (1.5 MW), Northern Pines Farm in Tisbury (900 kW), Pocasset Golf Club (100 to 250 kW), Pumpkin Pond Farm in Nantucket (35 to 250 kW), Saint Joseph's Abbey in Spencer (600 kW to 2 MW), Tufts University Veterinary School in Grafton and Westborough (600 kW to 2 MW), and the Town of Wareham (1.5 MW).&lt;/p&gt;</Discussion>
    <LastUpdated>2009-07-14T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Planned                                           </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1336</ID>
    <ProjectName>Massachusetts Turnpike Authority - Blandford Rest Area                                              </ProjectName>
    <OwnerOperator>Solaya Renewables                                                                                   </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Solaya Renewables                                                                                   </Developer>
    <City>Blandford                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.1946</Latitude>
    <Longitude>-72.9361</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1344</ID>
    <ProjectName>Massachusetts Water Resource Authority - Nut Island                                                 </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Black &amp; Veatch                                                                                      </Developer>
    <City>Quincy                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.2768</Latitude>
    <Longitude>-70.9497</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1326</ID>
    <ProjectName>Massachusetts Water Resource Authority DeLauri Pumping Station                                      </ProjectName>
    <OwnerOperator>MWRA                                                                                                </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Solaya Renewables                                                                                   </Developer>
    <City>Charlestown                                       </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Construction                                      </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.3754</Latitude>
    <Longitude>-71.0493</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>24</ID>
    <ProjectName>Massachusetts' Planned Community-Scale Wind Projects                                                </ProjectName>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Planned                                           </Status>
    <Discussion>&lt;p&gt;Massachusetts has more proposed community-scale wind projects than any other state in New England. With feasibility studies, and in some cases capital costs, funded by the state's Renewable Energy Trust, the Department of Capital Asset Management or, in limited cases, federal Clean Renewable Energy Bonds (CREBs), several dozen municipalities, state facilities, and other institutions are exploring ways to reduce their electricity costs and increase their energy independence.&lt;/p&gt;

&lt;ul&gt;
&lt;li&gt;&lt;h3&gt;Bourne Recreation Authority, Massachusetts Maritime Academy and Army Corps of Engineers&lt;/h3&gt;
&lt;p&gt;The Bourne Recreation Authority, Massachusetts Maritime Academy and Army Corps of Engineers are considering working together on the feasibility study of a commercial scale wind turbine off Taylor's Point.  The proposed site is approximately 100 feet from the academy's dock and is in non-navigable waters.  The parties are still exploring the legal issues associated with their potential partnership.  The group's interest in the project may also be contingent on the outcome of proposed net metering legislation currently being debated in the state legislature.&lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;City of Medford&lt;/h3&gt;
&lt;p&gt;The City of Medford held a dedication ceremony on January 29, 2009 for its newly constructed and operational Northwind 100-kW wind turbine. &lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Eastham, Lynn, Orleans, and Fairhaven&lt;/h3&gt;
&lt;p&gt;Eastham, Lynn, Orleans, and Fairhaven have completed their respective feasibility studies, including the temporary installation of meteorological towers to measure the wind resource characteristics.&lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Town of Eastham&lt;/h3&gt;
&lt;p&gt;In Eastham, the Board of Selectmen has appointed a committee to develop a wind bylaw.  The project is on hold until the bylaw can be completed, and integrated into the remaining process.  The town is considering a four-turbine installation, although the net metering portion of the pending energy bill currently may cause the town to rethink the size and location of the project.  &lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Town of Orleans&lt;/h3&gt;
&lt;p&gt;After over four years of study and deliberation, the Commissioners of the Town of Orleans Water Board decided not to proceed with a 3.3 MW wind project installation, citing insufficient financial benefits in the deal structure to justify their involvement.  The town had studied project feasibility supported by funding from the Massachusetts Technology Collaborative, which had also purchased two Vestas 1.65 MW V-82 turbines for the project. &lt;/p&gt;&lt;/li&gt;


&lt;li&gt;&lt;h3&gt;Several More Communities&lt;/h3&gt;
&lt;p&gt;In addition, several communities, including Brewster, Kingston, New Bedford, Plymouth, Rockport, Scituate, Wellfleet, Worcester and Yarmouth currently have technical and economic feasibility studies under way.  Additional information on the &lt;a href="http://masstech.org/project_List.cfm?init=44"&gt;communities participating in the Community Wind Collaborative&lt;/a&gt; is available.&lt;/p&gt;&lt;/li&gt;


&lt;li&gt;&lt;h3&gt;Town of Chester Municipal Light Plant&lt;/h3&gt;
&lt;p&gt;The Town of Chester Municipal Light Plant, which received a CREB authorization from the U.S. Department of the Treasury, is planning the installation of one or two 1.5-MW wind turbines on town-owned land. &lt;/p&gt;&lt;/li&gt;

&lt;/ul&gt;</Discussion>
    <LastUpdated>2009-03-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Planned                                           </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>30</ID>
    <ProjectName>Minuteman Wind                                                                                      </ProjectName>
    <OwnerOperator>TBD                                                                                                 </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Minuteman Wind                                                                                      </Developer>
    <City>Savoy                                             </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>12.5 MW                                           </TotalSizeOLD>
    <TotalSize>12500.000000</TotalSize>
    <TechnologyDescription>5 turbines at 2.5 MW each                                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.minutemanwind.com/"&gt;Minuteman Wind&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       </AdditionalResources>
    <Discussion>&lt;p&gt;On November 9, 2010, a quorum of 10 voters at a Town Meeting in Savoy, MA unanimously approved a measure to allow the town Selectmen to negotiate a "payment in lieu of taxes" (PILOT) program with Minuteman Wind, the developer of the wind project on West Hill. The PILOT agreement would ensure a steady yearly tax stream and would avoid the expense of re-assessing the project's value every three years. Minuteman Wind started the final step in the approval process by filing paperwork with the Conservation Commission shortly thereafter.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.5965</Latitude>
    <Longitude>-72.9696</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1338</ID>
    <ProjectName>Mount Wachusett Community College                                                                   </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Weston &amp; Samson                                                                                     </Developer>
    <City>Gardner                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>3.3 MW                                            </TotalSizeOLD>
    <TotalSize>3300.000000</TotalSize>
    <TechnologyDescription>3.3 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Construction                                      </Status>
    <Discussion />
    <LastUpdated>2010-06-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.5893</Latitude>
    <Longitude>-71.9854</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1236</ID>
    <ProjectName>Mountainview Grand Resort                                                                           </ProjectName>
    <OwnerOperator>Mountainview Grand Resort                                                                           </OwnerOperator>
    <Host>Mountainview Grand Resort                                                                           </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Whitefield                                        </City>
    <StateID>NH</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-10-01T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;  In Whitefield, New Hampshire, a single Northwind 100-kW turbine was erected in late September 2009 at the Mountain View Grand hotel.  The hotel expects the turbine, installed by Sustainable Energy Developments, to provide approximately one half of its electricity needs. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-02-24T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.3990</Latitude>
    <Longitude>-71.5846</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1388</ID>
    <ProjectName>Mrs. Coy's Organic Juice                                                                            </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Daniel and Pamela Parsons                                                                           </Developer>
    <City>Richford                                          </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>100 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-10-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.9738</Latitude>
    <Longitude>-72.6730</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1319</ID>
    <ProjectName>Nantucket High School Wind                                                                          </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Alteris Renewables                                                                                  </Developer>
    <City>Nantucket                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <Discussion>&lt;p&gt;The Nantucket High School Northwind 100 wind turbine was installed in September of 2010 and started operating in November. Soon after installation was completed local residents raised concerns over the possible sound of the turbine and the possibility of ice throws. In response to the concerns the high school agreed to run the turbine on a limited schedule in the fall to ensure that it was not spinning while students were on the athletic fields. They plan to run it normally during the winter. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.2728</Latitude>
    <Longitude>-70.0962</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1298</ID>
    <ProjectName>Narragansett Bay Commission                                                                         </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Providence                                        </City>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1-5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 W                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.4204</Latitude>
    <Longitude>-71.4706</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1249</ID>
    <ProjectName>Nature's Classroom                                                                                  </ProjectName>
    <OwnerOperator>Nature's Classroom                                                                                  </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>New England Breeze                                                                                  </Developer>
    <City>Charlton                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-04-10T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt; In April 2009, Nature's Classroom installed a 100-kW turbine on its 300-acre Charlton, Massachusetts, educational facility. The turbine was installed by New England Breeze and was part of the campus' larger energy strategy, including multiple LEED certifiable buildings and a solar array. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-01-18T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.1110</Latitude>
    <Longitude>-72.0050</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1290</ID>
    <ProjectName>New Boston Wind Farm                                                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Southport Power, LLC                                                                                </Developer>
    <City>Jacksonville                                      </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.95 MW                                           </TotalSizeOLD>
    <TotalSize>1951.000000</TotalSize>
    <TechnologyDescription>1.95 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.7966</Latitude>
    <Longitude>-72.8216</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1247</ID>
    <ProjectName>New England Technical Institute                                                                     </ProjectName>
    <OwnerOperator>New England Technical Institute                                                                     </OwnerOperator>
    <Host>New England Technical Institute                                                                     </Host>
    <Developer>Alteris Renewables                                                                                  </Developer>
    <City>Warwick                                           </City>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-08-06T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt; At the end of July 2009, New England Technical Institute, Warwick, Rhode Island, installed a 100-kW wind turbine that is providing power to its automotive technology building and serving as a teaching tool. The project was installed by Alteris Renewables and cost the school $455,000. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-01-18T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.7137</Latitude>
    <Longitude>-71.4447</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1283</ID>
    <ProjectName>New Shoreham Offshore Wind Farm                                                                     </ProjectName>
    <OwnerOperator>Deepwater Wind                                                                                      </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Phase 1 -- Block Island Wind Farm                                                                   </Developer>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>25 MW                                             </TotalSizeOLD>
    <TotalSize>25000.000000</TotalSize>
    <TechnologyDescription>25 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Offshore                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://dwwind.com/"&gt;Deepwater Wind&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  </AdditionalResources>
    <Discussion>&lt;p&gt;On September 25, 2008, Governor Carcieri announced that Deepwater Wind was chosen as the developer to construct Rhode Island's first offshore wind farm. The project will be completed in two stages with the first part to be sited in state waters and the second stage to take place in federal waters. The first phase, the New Shoreham Offshore Wind Project, received approval of a long-term contract with National Grid on August 11, 2010. Once the Rhode Island Public Utilities Commission (PUC) approved the contract, the appeal process began, and continues in earnest. Numerous appeals have been filed, and the briefs for Deepwater Wind, National Grid and the political intervenors are due on January 13, 2011 with reply briefs due on February 3, 2011 and oral arguments in the spring of 2011.  Once successful, the project should take 3-4 years to build. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-06-28T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.0956</Latitude>
    <Longitude>-71.4827</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1299</ID>
    <ProjectName>North Country Wind                                                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Wagner Forest Management                                                                            </Developer>
    <City>Coos County                                       </City>
    <StateID>NH</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>180 MW                                            </TotalSizeOLD>
    <TotalSize>180000.000000</TotalSize>
    <TechnologyDescription>180 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-15T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.8281</Latitude>
    <Longitude>-71.2989</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1389</ID>
    <ProjectName>Northeast Mountain                                                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sergei Kniazev and Olga Julinska                                                                    </Developer>
    <City>Wells                                             </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSize>1800.000000</TotalSize>
    <TechnologyDescription>1.8 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-11-24T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>43.4354</Latitude>
    <Longitude>-73.1666</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1328</ID>
    <ProjectName>NOTUS Clean Energy                                                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewables                                                                                   </Developer>
    <City>Falmouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.65 MW                                           </TotalSizeOLD>
    <TotalSize>1650.000000</TotalSize>
    <TechnologyDescription>1 Vestas V82 1.65 MW Turbine                                                                                                                                                                                                                                   </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2010-07-28T00:00:00-06:00</CommissionDate>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6082</Latitude>
    <Longitude>-70.6069</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>32</ID>
    <ProjectName>Number 9                                                                                            </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Horizon Wind Energy and Linekin Bay Energy Company                                                  </Developer>
    <City>Aroostook County                                  </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>~350 MW                                           </TotalSizeOLD>
    <TotalSize>350000.000000</TotalSize>
    <TechnologyDescription>~350 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt; The Northern Maine Aroostook County Wind Project may represent 500 or more MW of wind generation potential.  Project developers Horizon Wind Energy and Linekin Bay Energy are looking to develop the project in phases, with the first, Number 9, expected to be up to 350 MW in capacity. Wind measurement and environmental studies are ongoing.  &lt;/p&gt;&lt;p class='small'&gt;&lt;/p&gt;</Discussion>
    <LastUpdated>2010-05-05T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>46.4702</Latitude>
    <Longitude>-68.3538</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>193</ID>
    <ProjectName>Oakfield Wind                                                                                       </ProjectName>
    <OwnerOperator>TBD                                                                                                 </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>First Wind                                                                                          </Developer>
    <City>Oakfield                                          </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>50 MW                                             </TotalSizeOLD>
    <TotalSize>50000.000000</TotalSize>
    <TechnologyDescription>50 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion>&lt;p&gt;The project is currently in advanced stages of development.&lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-05T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>46.0552</Latitude>
    <Longitude>-68.0999</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>207</ID>
    <ProjectName>Owl and Jimmy Mountain                                                                              </ProjectName>
    <OwnerOperator>Evergreen Wind Power, LLC                                                                           </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>First Wind                                                                                          </Developer>
    <City>Unorganized territory in eastern Washington County</City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>57 MW                                             </TotalSizeOLD>
    <TotalSize>25500.000000</TotalSize>
    <TechnologyDescription>25.5 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2010-04-07T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;The project formerly known as Stetson II, a 25 MW expansion to the operating Stetson windfarm has filed its permits and expects to be commercially operating by the end of 2009 or early 2010. &lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-31T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.9849</Latitude>
    <Longitude>-67.6776</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>52</ID>
    <ProjectName>Passadumkeag Mountain                                                                               </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Noble Environmental Power                                                                           </Developer>
    <City>Penobscot County                                  </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>38.5 MW                                           </TotalSizeOLD>
    <TechnologyDescription>Unknown project size                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt;Maine's Land Use Regulation Commission has approved the project's meteorological tower application. Further information will be provided when available.&lt;/p&gt;</Discussion>
    <LastUpdated>2010-03-31T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>45.3230</Latitude>
    <Longitude>-68.5806</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1240</ID>
    <ProjectName>Phoenix Press                                                                                       </ProjectName>
    <OwnerOperator>Phoenix Press                                                                                       </OwnerOperator>
    <Host>Phoenix Press                                                                                       </Host>
    <Developer>Alteris Renewables                                                                                  </Developer>
    <City>New Haven                                         </City>
    <StateID>CT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2010-02-22T00:00:00-07:00</CommissionDate>
    <Discussion>&lt;p&gt; In January 2010, Phoenix Press broke ground on its 100-kW wind turbine project. The project is the first 100-kW or greater project installed in Connecticut, and started operating in late February 2010.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.3023</Latitude>
    <Longitude>-72.9010</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1320</ID>
    <ProjectName>Pocasset Golf Course                                                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Bourne                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6881</Latitude>
    <Longitude>-70.6095</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1302</ID>
    <ProjectName>Port Service Authority, Jackman Maine                                                               </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Alteris Renewables                                                                                  </Developer>
    <City>Jackman                                           </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>200 kW                                            </TotalSizeOLD>
    <TotalSize>200.000000</TotalSize>
    <TechnologyDescription>2 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>45.6564</Latitude>
    <Longitude>-70.2461</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>26</ID>
    <ProjectName>Portsmouth Abbey                                                                                    </ProjectName>
    <OwnerOperator>Portsmouth Abbey                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Portsmouth                                        </City>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>660 kW                                            </TotalSizeOLD>
    <TotalSize>660.000000</TotalSize>
    <TechnologyDescription>Single Vestas V-47 660 kW turbine                                                                                                                                                                                                                              </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2006-04-01T00:00:00-06:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.portsmouthabbey.org/page/1018/ "&gt;Portsmouth Abbey School&lt;/a&gt;&lt;/p&gt;

&lt;p&gt;&lt;a href="http://www.eastbayri.com/story/362542130098478.php"&gt;Zoning board approves Abbey's wind turbine&lt;/a&gt;. (May 13, 2005).&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          </AdditionalResources>
    <Discussion>&lt;p&gt;This turbine was installed in Spring 2006 and is interconnected to serve the host facility's load.&lt;/p&gt;

&lt;p&gt;The project was supported by a $450,000 grant from the &lt;a href="http://www.riseo.state.ri.us/riref/"&gt;Rhode Island Renewable Energy Fund&lt;/a&gt;.&lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/26_portsmouth_abbeyt.jpg                                     </Photo1>
    <Photo1Alt>A photo of a wind turbine.                                                                                                                                                                                                                                                                                  </Photo1Alt>
    <Photo1Caption>Wind turbine and Abbey Church on the campus of Portsmouth Abbey school in Portsmouth, Rhode Island.                                                                                                                                                                                                         </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/26_portsmouth_abbey.jpg                                      </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>150 </Photo1Height>
    <LastUpdated>2008-04-22T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.5992</Latitude>
    <Longitude>-71.2684</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>11</ID>
    <ProjectName>Princeton Municipal Light Department (PMLD)                                                         </ProjectName>
    <OwnerOperator>Princeton Municipal Light Department (PMLD)                                                         </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Princeton Municipal Light Department (PMLD)                                                         </Developer>
    <City>Princeton                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>3 MW                                              </TotalSizeOLD>
    <TotalSize>3000.000000</TotalSize>
    <TechnologyDescription>3MW, 2 Fuhrlander turbines @ 1.5 MW each                                                                                                                                                                                                                       </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-11-15T00:00:00-07:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.pmld.com/Home.htm"&gt;Princeton Municipal Light Department&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  </AdditionalResources>
    <Discussion>&lt;p&gt; In August 2008, the Princeton Municipal Light Department broke ground for the installation of two 1.5-MW Fuhrlander wind turbines to replace the eight 40-kW machines that had been in operation on the southwest side of Mount Wachusett since 1984.  Site preparations were completed during fall 2008 and the turbines arrived in the summer of 2009. Princeton erected the turbines in October 2009, and the Princeton Municipal Light Department Wind Farm became operational in mid-November. The Princeton Municipal Light Department Wind Farm is expected to provide an average of 40% of the town's annual load. &lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/11_cei_masswindt.jpg                                         </Photo1>
    <Photo1Alt>A photo simulation of two wind turbines. Photo courtesy of Princeton Municipal Light Department.                                                                                                                                                                                                            </Photo1Alt>
    <Photo1Caption>Photo Simulation.                                                                                                                                                                                                                                                                                           </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/11_cei_masswind.jpg                                          </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>158 </Photo1Height>
    <LastUpdated>2009-12-09T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.4860</Latitude>
    <Longitude>-71.8864</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>40</ID>
    <ProjectName>Record Hill Wind Project                                                                            </ProjectName>
    <OwnerOperator>TBD                                                                                                 </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Independence Wind, LLC                                                                              </Developer>
    <City>Byron and Roxbury                                 </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>Up to 50 MW                                       </TotalSizeOLD>
    <TotalSize>50000.000000</TotalSize>
    <TechnologyDescription>Up to 50 MW                                                                                                                                                                                                                                                    </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Construction                                      </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://independencewind.com/"&gt;Independence Wind&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     </AdditionalResources>
    <Discussion>&lt;p&gt; In mid-January 2011, the Maine Supreme Judicial Court heard arguments over the proposed Record Hill wind farm. In dispute was the permit given by the Maine Board of Environmental Protection (BEP) for the project, the processes by which large wind-power projects get approved and the noise standards used. The appeal was filed by the Concerned Citizens to Save Roxbury Pond and has tied up financing and put the phase 1 construction of the $120-million project on hold.  &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.6880</Latitude>
    <Longitude>-70.6176</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>206</ID>
    <ProjectName>Rhode Island Offshore Initiatives                                                                   </ProjectName>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <ProjectType>Offshore                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt; A number of early stage offshore initiatives have recently been announced in Rhode Island, including: Blue Water Wind (RI, ~450 MW),  Blue H (RI, ~420 MW), and Gray's Harbor RI (an additional ~1,000 MW).&lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-31T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>220</ID>
    <ProjectName>Rhode Island Planned Customer-Sited Wind Projects                                                   </ProjectName>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Planned                                           </Status>
    <Discussion>&lt;ul&gt;
&lt;li&gt;&lt;h3&gt;Raytheon Portsmouth Rhode Island Wind Project&lt;/h3&gt;
&lt;p&gt;A 3-MW (two 1.5-MW turbines) proposed project at Raytheon's Portsmouth facility is expected to be operational in 2010. Raytheon is in the process of negotiating with construction firms. &lt;/p&gt;&lt;/li&gt;
&lt;/ul&gt;</Discussion>
    <LastUpdated>2009-07-14T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Planned                                           </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>25</ID>
    <ProjectName>Rhode Island's Planned Community-Scale Wind Projects                                                </ProjectName>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Planned                                           </Status>
    <Discussion>&lt;p&gt;The &lt;a href="http://www.energy.ri.gov/programs/renewable.php"&gt;Rhode Island Renewable Energy Fund&lt;/a&gt; is actively supporting customer-sited wind installations using commercial-scale technology. &lt;/p&gt;

&lt;ul&gt;
&lt;li&gt;&lt;h3&gt;Barrington&lt;/h3&gt;
&lt;p&gt;The Barrington proposed wind project was found to be infeasible and all plans for development have ceased.&lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Bristol&lt;/h3&gt;
&lt;p&gt;Explorations of potential sites are also underway in Bristol, with the support of the Wind Power Rhode Island Project. The Project, administered through the Center for Macro Projects and Diplomacy at Roger Williams University, is providing wind measurement, photo simulations, and community outreach support.&lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Jamestown&lt;/h3&gt;
&lt;p&gt;Jamestown has received $30,000 in funding from The Rhode Island Renewable Energy Fund to conduct a wind power feasibility study to determine the possibility of siting between a single, 800-kW turbine and three, 2-MW turbines in town. &lt;/p&gt;&lt;/li&gt;

&lt;li&gt;&lt;h3&gt;Town of Westerly&lt;/h3&gt;
&lt;p&gt;The REDF Board also approved a wind feasibility study grant request from the Town of Westerly.&lt;/p&gt;&lt;/li&gt;  

&lt;li&gt;&lt;h3&gt;University of Rhode Island's Narragansett Campus&lt;/h3&gt;
&lt;p&gt; Another installation is being actively investigated at the University of Rhode Island's Narragansett campus.  &lt;/p&gt;&lt;/li&gt;

&lt;/ul&gt;</Discussion>
    <LastUpdated>2009-07-14T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Planned                                           </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>199</ID>
    <ProjectName>Rollins Mountain                                                                                    </ProjectName>
    <OwnerOperator>First Wind                                                                                          </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>First Wind                                                                                          </Developer>
    <City>Danforth                                          </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>60 MW                                             </TotalSizeOLD>
    <TotalSize>60000.000000</TotalSize>
    <TechnologyDescription>60 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Construction                                      </Status>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.noblepower.com/our-projects/GrandpasKnob/index.html"&gt;Noble Environmental Power&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           </AdditionalResources>
    <Discussion>&lt;p&gt; After a November 30, 2010 request to the Maine Supreme Judicial Court from the Friends of Lincoln Lakes to suspend construction of Rollins Mountain wind farm until the developer could prove it had the financial means to finish the project, the developer, First Wind, announced on December 3 that it had secured $98 million in financing.  In addition to the financing, JPM Capital Corporation has executed a tax equity financing agreement with a subsidiary of First Wind. When the project goes into commercial operation, JPM Capital will provide long-term capital to take out the construction loan. It's 20-year PPA with Central Maine Power and Bangor-Hydro, was approved in 2009. Construction is expected to be completed by late summer or early fall of 2011.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>45.3330</Latitude>
    <Longitude>-68.3738</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1248</ID>
    <ProjectName>Saco Train Station                                                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Entegrity Wind Systems                                                                              </Developer>
    <City>Saco                                              </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>50 kW                                             </TotalSizeOLD>
    <TotalSize>50.000000</TotalSize>
    <TechnologyDescription>1 50 kW Entegrity Wind Systems                                                                                                                                                                                                                                 </TechnologyDescription>
    <ProjectType>Small Wind (&lt;100 kW)                              </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-07-02T00:00:00-06:00</CommissionDate>
    <Discussion> &lt;p&gt; In July 2009, the Saco Train Station commissioned its 50-kW wind turbine provided and installed by Entegrity Wind Systems. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-01-18T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>43.4955</Latitude>
    <Longitude>-70.4480</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>201</ID>
    <ProjectName>Saddleback Ridge Wind                                                                               </ProjectName>
    <ProjectNameURL>http://www.patriotrenewables.com                                                                                                                                                                                                                               </ProjectNameURL>
    <OwnerOperator>Saddleback Ridge Wind, LLC                                                                          </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Patriot Renewables                                                                                  </Developer>
    <City>Carthage                                          </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSize>33000.000000</TotalSize>
    <TechnologyDescription>12 GE 2.75-103, 2.75-MW turbines                                                                                                                                                                                                                               </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Permitted                                         </Status>
    <Discussion>&lt;p&gt;The Saddleback Ridge Wind project permit is under appeal.&lt;/p&gt;</Discussion>
    <LastUpdated>2012-01-30T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.6337</Latitude>
    <Longitude>-70.3874</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Permitted                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1</ID>
    <ProjectName>Searsburg Wind Power Project                                                                        </ProjectName>
    <OwnerOperator>Green Mountain Power Corporation                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Searsburg                                         </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>6.6 MW                                            </TotalSizeOLD>
    <TotalSize>6600.000000</TotalSize>
    <TechnologyDescription>6.6 MW, 11 @ Zond 550 kW                                                                                                                                                                                                                                       </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>1996-06-01T00:00:00-06:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.gmpvt.com/whoweare/searsburg.shtml"&gt;http://www.gmpvt.com/whoweare/searsburg.shtml&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        </AdditionalResources>
    <Discussion>&lt;p&gt;In commercial operation since June 1996. The project is New England's first commercial-scale, utility-class wind energy project. &lt;/p&gt;</Discussion>
    <Photo1>/newengland/images/thumbnails/projects/1_searsburgt.jpg                                             </Photo1>
    <Photo1Alt>Photo of wind turbines on a snowy mountain top. PIX05768                                                                                                                                                                                                                                                    </Photo1Alt>
    <Photo1Caption>The Green Mountain power plant consists of eleven 550-kW Zond Z-40FS wind turbines developed under the DOE Turbine Development Program.                                                                                                                                                                     </Photo1Caption>
    <Photo1Link>/newengland/images/thumbnails/projects/1_searsburg.jpg                                              </Photo1Link>
    <Photo1Width>200 </Photo1Width>
    <Photo1Height>142 </Photo1Height>
    <LastUpdated>2009-03-05T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.8610</Latitude>
    <Longitude>-72.9635</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1294</ID>
    <ProjectName>Shalom Housing                                                                                      </ProjectName>
    <OwnerOperator>Jewish Seniors Agency                                                                               </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Warwick                                           </City>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-05-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.7238</Latitude>
    <Longitude>-71.4641</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>28</ID>
    <ProjectName>Sheffield Wind Farm                                                                                 </ProjectName>
    <OwnerOperator>First Wind                                                                                          </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>First Wind                                                                                          </Developer>
    <City>Hardscrabble Mountain, Sheffield                  </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>40 MW                                             </TotalSizeOLD>
    <TotalSize>40000.000000</TotalSize>
    <TechnologyDescription>40 MW, 16 x 2.5-MW turbines                                                                                                                                                                                                                                    </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Construction                                      </Status>
    <Discussion>&lt;p&gt;The 40-MW Sheffield Wind project in Vermont's Northeast Kingdom was granted its last required permit&amp;mdash;a stormwater discharge permit which had been under appeal&amp;mdash;on August 26, 2010, clearing the way for the project to proceed. On December 23, 2010, developer, First Wind announced that it has obtained $76 million in financing for the project, comprised of a $71.3 million non-recourse construction loan and a $4.5 million letter of credit facility. With this financing in place, the construction, which began in September 2010, will now continue on schedule. The Sheffield Wind Project will be the largest wind energy project to date in Vermont.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.6461</Latitude>
    <Longitude>-72.0963</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Construction                                      </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1390</ID>
    <ProjectName>Smugglers Hill Farm Wind                                                                            </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Encore Redevelopment/Blue Wave Capital                                                              </Developer>
    <City>Derby Line                                        </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-11-24T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>45.0049</Latitude>
    <Longitude>-72.1015</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>202</ID>
    <ProjectName>Spruce Mountain Wind                                                                                </ProjectName>
    <ProjectNameURL>http://www.sprucemountainwind.com                                                                                                                                                                                                                              </ProjectNameURL>
    <OwnerOperator>Spruce Mountain Wind, LLC                                                                           </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Patriot Renewables                                                                                  </Developer>
    <City>Woodstock                                         </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSize>20000.000000</TotalSize>
    <TechnologyDescription>10 Gamesa G90, 2-MW turbines                                                                                                                                                                                                                                   </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Operating                                         </Status>
    <AdditionalResources>&lt;a href="http://www.facebook.com/SpruceMountainWindProject"&gt;www.facebook.com/SpruceMountainWindProject&lt;/a&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              </AdditionalResources>
    <Discussion>&lt;p&gt;Operational in December 2011.&lt;/p&gt;</Discussion>
    <LastUpdated>2012-01-30T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.4136</Latitude>
    <Longitude>-70.5830</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>195</ID>
    <ProjectName>St. Mary's Abbey                                                                                    </ProjectName>
    <OwnerOperator>Cistercians of the Strict Observance, Mt. Saint Mary's                                              </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Wrentham                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>2 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2010-01-15T00:00:00-07:00</CommissionDate>
    <Discussion>&lt;p&gt; Mount St. Mary's Abbey installed its 100-kW wind turbine with its contractor, Sustainable Energy Developments in December 2009. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-01-19T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.0425</Latitude>
    <Longitude>-71.3942</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1292</ID>
    <ProjectName>Stamford Wind Farm                                                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Southport Power, LLC                                                                                </Developer>
    <City>Stamford                                          </City>
    <StateID>VT</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.95 MW                                           </TotalSizeOLD>
    <TotalSize>1951.000000</TotalSize>
    <TechnologyDescription>1.95 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.7753</Latitude>
    <Longitude>-73.0793</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>38</ID>
    <ProjectName>Stetson Ridge Wind Project                                                                          </ProjectName>
    <OwnerOperator>Evergreen Wind Power, LLC                                                                           </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>First Wind                                                                                          </Developer>
    <City>Unorganized territory in eastern Washington County</City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>57 MW                                             </TotalSizeOLD>
    <TotalSize>57000.000000</TotalSize>
    <TechnologyDescription>57 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-01-22T00:00:00-07:00</CommissionDate>
    <Discussion>&lt;p&gt;First Wind's 57-MW installation on Stetson Ridge in Washington County is fully operational as of December 2008. The ribbon-cutting ceremony took place January 22, 2009, marking the official date of commercial operation. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.9849</Latitude>
    <Longitude>-67.6776</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1330</ID>
    <ProjectName>Templeton Municipal Light and Water Company                                                         </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Power Options, LLC                                                                                  </Developer>
    <City>Templeton                                         </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.65 MW                                           </TotalSizeOLD>
    <TotalSize>1650.000000</TotalSize>
    <TechnologyDescription>1 AAER 1.65 MW Turbine                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Operating                                         </Status>
    <Discussion>&lt;p&gt;Expanding on its initial plans to install a weather station and small wind turbine demonstration project at a local school, the Templeton Municipal Light &amp;amp; Water Co. completed a feasibility study and received a $2.16 Million CREBs allocation. The municipal utility installed (on district school property) a 1.65-MW turbine in the summer of 2010, which was operating by September of that year. The turbine provides electricity to the municipal utility system, as opposed to being connected behind the school's meter.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.5895</Latitude>
    <Longitude>-72.0772</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1301</ID>
    <ProjectName>Timberwinds                                                                                         </ProjectName>
    <ProjectNameURL>http://www.patriotrenewables.com                                                                                                                                                                                                                               </ProjectNameURL>
    <OwnerOperator>Timberwinds, LLC                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Patriot Renewables                                                                                  </Developer>
    <City>Dixfield                                          </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TechnologyDescription>Unknown project size, likely 20-30 MW                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <LastUpdated>2012-01-30T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>44.5673</Latitude>
    <Longitude>-70.3165</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1315</ID>
    <ProjectName>Town of Barnstable Wastewater Treatment Facility                                                    </ProjectName>
    <OwnerOperator>Town of Barnstable                                                                                  </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewables / Lumus Construction                                                              </Developer>
    <City>Barnstable                                        </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>200 kW                                            </TotalSizeOLD>
    <TotalSize>200.000000</TotalSize>
    <TechnologyDescription>2 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6651</Latitude>
    <Longitude>-70.3043</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1335</ID>
    <ProjectName>Town of Falmouth II, Wastewater Treatment Facility                                                  </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Solaya Energy                                                                                       </Developer>
    <City>Falmouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1650.000000</TotalSize>
    <TechnologyDescription>1.65 MW                                                                                                                                                                                                                                                        </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <Discussion>&lt;p&gt;This turbine is the second installed at the Wastewater Treatment Facility in Falmouth, MA. The first turbine at the site has garnered attention for its noise levels which neighbors have complained are too loud. In September 2010, noise consultants were hired to test the levels. They considered the additional sound of the second turbine, prior to its operation in Spring 2011, and concluded that the anticipated combined noise levels could be exceeded for some nearby homes. Despite these results and the local resistance to the turbine, the turbine was commissioned and is operational.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-03-30T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6057</Latitude>
    <Longitude>-70.6212</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1238</ID>
    <ProjectName>Town of Falmouth Wastewater Treatment Facility                                                      </ProjectName>
    <OwnerOperator>Town of Falmouth                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>JK Scanlan Company                                                                                  </Developer>
    <City>Falmouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.65 MW                                           </TotalSizeOLD>
    <TotalSize>1650.000000</TotalSize>
    <TechnologyDescription>1 Vestas V82 1.65 MW Turbine                                                                                                                                                                                                                                   </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2010-01-01T00:00:00-07:00</CommissionDate>
    <Discussion>&lt;p&gt;The turbine, which was insalled in late fall 2009, has come under increased scrutiny for the noise levels which neighbors have complained are too loud. At a town meeting on September 27 sound consultants presented the results of their research on the noise impact of the turbine. They concluded that the turbine does not exceed the DEP guidelines of 10dBa over ambient sound registered at night. On December 8, the Falmouth Zoning Board of Appeals met to discuss how the local zoning bylaw should be applied to the turbine after the Falmouth Building and Zoning Commissioner had determined that the turbine is a municipal use and therefore did not require a special permit from the board of appeals. The appellant has argued that town zoning bylaws require wind turbines to receive special permits and since this turbine did not, it should be shut down by the board of appeals. Town representatives have argued that the turbine is a municipal use and therefore permitted by right. No decision was reached, and the Zoning Board of Appeals continued the proceedings until January 20.  &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6057</Latitude>
    <Longitude>-70.6212</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1313</ID>
    <ProjectName>Town of Hanover, Pond St Water Facility                                                             </ProjectName>
    <OwnerOperator>Town of Hanover                                                                                     </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Hanover                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>225 kW                                            </TotalSizeOLD>
    <TotalSize>225.000000</TotalSize>
    <TechnologyDescription>225 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt;The Town of Hanover expects to commence construction of its 225-kW turbine at the waste water treatment facility in fall 2010.  The construction process is expected to take four to six weeks.&lt;/p&gt;&lt;p class='small'&gt;&lt;/p&gt;</Discussion>
    <LastUpdated>2010-04-16T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.1374</Latitude>
    <Longitude>-70.8329</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1327</ID>
    <ProjectName>Town of Ipswich                                                                                     </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer xml:space="preserve">                                                                                                    </Developer>
    <City>Ipswich                                           </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.65 MW                                           </TotalSizeOLD>
    <TotalSize>1650.000000</TotalSize>
    <TechnologyDescription>1 AAER 1.65 MW Turbine                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.7150</Latitude>
    <Longitude>-70.8450</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1391</ID>
    <ProjectName>Town of Kingston Wind                                                                               </ProjectName>
    <OwnerOperator>Town of Kingston                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>TBD (RFP out to bid)                                                                                </Developer>
    <City>Kingston                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-10-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.9786</Latitude>
    <Longitude>-70.7151</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1342</ID>
    <ProjectName>Town of Milton                                                                                      </ProjectName>
    <OwnerOperator>Milton                                                                                              </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Loria Emerging Energy Consulting                                                                    </Developer>
    <City>Milton                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>2 MW                                              </TotalSizeOLD>
    <TotalSize>2000.000000</TotalSize>
    <TechnologyDescription>2 MW                                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt;The proposed 2-MW wind turbine still needs approval from the town Conservation Commission. In early 2011, the Granite Links Golf Club, next door to the proposed turbine site, decided to sue the town of Milton, asking for both a preliminary and permanent injunction to stop construction.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.2437</Latitude>
    <Longitude>-71.0528</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1324</ID>
    <ProjectName>Town of Plymouth                                                                                    </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Solaya Renewables                                                                                   </Developer>
    <City>Plymouth                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>4 MW                                              </TotalSizeOLD>
    <TotalSize>4000.000000</TotalSize>
    <TechnologyDescription>4 MW                                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.9233</Latitude>
    <Longitude>-70.5890</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>192</ID>
    <ProjectName>Town of Portsmouth                                                                                  </ProjectName>
    <OwnerOperator>Town of Portsmouth                                                                                  </OwnerOperator>
    <Host>Portsmouth High School                                                                              </Host>
    <Developer>Town of Portsmouth                                                                                  </Developer>
    <City>Portsmouth                                        </City>
    <StateID>RI</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-03-01T00:00:00-07:00</CommissionDate>
    <AdditionalResources>&lt;p&gt;&lt;a href="http://www.portsmouthrienergy.com/"&gt;Portsmouth Economic Development Committee, Sustainable Energy Subcommittee&lt;/a&gt;&lt;/p&gt;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      </AdditionalResources>
    <Discussion>&lt;p&gt;On June 13, 2008, the Town of Portsmouth broke ground for the installation of a single 1.5 MW AAER wind turbine.  Major wind turbine component parts were delivered to the site in January and the assembly and commissioning of the 1.5 MW project was completed in the several weeks following.  The turbine is located at the high school and may be the first Clean Renewable Energy Bond funded wind project to be completed in New England.&lt;/p&gt;</Discussion>
    <LastUpdated>2009-03-05T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.6152</Latitude>
    <Longitude>-71.2495</Longitude>
    <MarkerType>green          </MarkerType>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1346</ID>
    <ProjectName>Town of Scituate, Sewer Plant                                                                       </ProjectName>
    <OwnerOperator>Solaya Energy                                                                                       </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Solaya Renewables                                                                                   </Developer>
    <City>Scituate                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>1.5 MW                                            </TotalSizeOLD>
    <TotalSize>1500.000000</TotalSize>
    <TechnologyDescription>1.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.1742</Latitude>
    <Longitude>-70.7288</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1392</ID>
    <ProjectName>Tuttle Hill - Antrim                                                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Eolian Renewables                                                                                   </Developer>
    <City>Antrim                                            </City>
    <StateID>NH</StateID>
    <CountryID>US</CountryID>
    <TotalSize>18000.000000</TotalSize>
    <TechnologyDescription>18 MW                                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion />
    <LastUpdated>2010-10-04T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>43.0615</Latitude>
    <Longitude>-72.0087</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1243</ID>
    <ProjectName>University of Maine, Presque Isle                                                                   </ProjectName>
    <OwnerOperator>University of Maine                                                                                 </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Lumus Construction                                                                                  </Developer>
    <City>Presque Isle                                      </City>
    <StateID>ME</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>600 kW                                            </TotalSizeOLD>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>1 600 kW RRB PS-600                                                                                                                                                                                                                                            </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-07-01T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt; The University of Maine installed a single 600-kW turbine at its Presque Isle campus making it the first university in Maine to locate a wind turbine on campus. The turbine was installed by Lumus Construction and achieved commercial operation in June 17, 2009. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-01-18T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>46.6706</Latitude>
    <Longitude>-68.0190</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1339</ID>
    <ProjectName>Upper Cape Technical Regional School                                                                </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Weston &amp; Samson                                                                                     </Developer>
    <City>Bourne                                            </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>3 MW                                              </TotalSizeOLD>
    <TotalSize>3000.000000</TotalSize>
    <TechnologyDescription>3 MW                                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Community Scale                                   </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.7412</Latitude>
    <Longitude>-70.5634</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1334</ID>
    <ProjectName>Varian Semiconductors                                                                               </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewables                                                                                   </Developer>
    <City>Gloucester                                        </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>2.5 MW                                            </TotalSizeOLD>
    <TotalSize>2500.000000</TotalSize>
    <TechnologyDescription>2.5 MW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Permitted                                         </Status>
    <Discussion />
    <LastUpdated>2010-04-09T00:00:00-06:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.6288</Latitude>
    <Longitude>-70.6446</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Permitted                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1393</ID>
    <ProjectName>Wampanoag Tribe of Gay Head                                                                         </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Boreal Renewable Energy                                                                             </Developer>
    <City>Aquinnah                                          </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>600 kW                                                                                                                                                                                                                                                         </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Seeking Permits                                   </Status>
    <Discussion />
    <LastUpdated>2010-11-24T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.3334</Latitude>
    <Longitude>-70.7993</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Seeking Permits                                   </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1245</ID>
    <ProjectName>Williams Stone                                                                                      </ProjectName>
    <OwnerOperator>Williams Stone                                                                                      </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Otis                                              </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>600 kW                                            </TotalSizeOLD>
    <TotalSize>600.000000</TotalSize>
    <TechnologyDescription>1, 600-kW Vestas RRB Turbine                                                                                                                                                                                                                                   </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-07-02T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt;Williams Stone, Inc. in East Otis, MA installed a 600-kW, Vestas RRB wind turbine. The turbine was dedicated in the summer 2009 and achieved commercial operation in July 2009. The turbine is expected to produce more than half of the onsite demand at the granite curb manufacturing facility. &lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>42.2344</Latitude>
    <Longitude>-73.0697</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1281</ID>
    <ProjectName>Wind Colebrook                                                                                      </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>BNE Energy                                                                                          </Developer>
    <City>Colebrook                                         </City>
    <StateID>CT</StateID>
    <CountryID>US</CountryID>
    <TechnologyDescription>Unknown project size                                                                                                                                                                                                                                           </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt;On December 15, 2010 BNE Energy, the developer for the Colebrook wind farm, filed two Petitions for a declaratory ruling for two separate 4.8-MW wind turbine sites (a total of three GE 1.6-MW turbines each) in Colebrook, Connecticut. In response, the Colebrook Planning and Zoning Commission filed Comments in which they stated that the petitions present several potential violations of the town's zoning regulations, and also contradict both the spirit and intent of the state-mandated Town Plan of Conservation and Development. The Commission requested that a public hearing be conducted in Colebrook, to focus full attention on the possible impacts to the town, and asked the Siting Council to impose a moratorium until appropriate standards and regulations are established at the state and local level.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.9635</Latitude>
    <Longitude>-73.1097</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1282</ID>
    <ProjectName>Wind Prospect                                                                                       </ProjectName>
    <OwnerOperator xml:space="preserve">                                                                                                    </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>BNE Energy                                                                                          </Developer>
    <City>Prospect                                          </City>
    <StateID>CT</StateID>
    <CountryID>US</CountryID>
    <TotalSize>3200.000000</TotalSize>
    <TechnologyDescription>2, GE 1.6-MW turbines                                                                                                                                                                                                                                          </TechnologyDescription>
    <ProjectType>Windfarm                                          </ProjectType>
    <Status>In Development                                    </Status>
    <Discussion>&lt;p&gt;On November 17, 2010, BNE Energy, the developer of the Colebrook wind project in Colebrook, CT, filed with the Connecticut Siting Council for a declaratory ruling to approve the location, construction, and operation of the 3.2-MW (two GE 1.6-MW turbines) wind generation facility in Prospect.&lt;/p&gt;</Discussion>
    <LastUpdated>2011-01-20T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.4986</Latitude>
    <Longitude>-72.9731</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>In Development                                    </StatusDisplay>
  </ITEM>
  <ITEM>
    <ID>1246</ID>
    <ProjectName>Woods Hole Research Center                                                                          </ProjectName>
    <OwnerOperator>Woods Hole Research Center                                                                          </OwnerOperator>
    <Host xml:space="preserve">                                                                                                    </Host>
    <Developer>Sustainable Energy Developments, Inc.                                                               </Developer>
    <City>Woods Hole                                        </City>
    <StateID>MA</StateID>
    <CountryID>US</CountryID>
    <TotalSizeOLD>100 kW                                            </TotalSizeOLD>
    <TotalSize>100.000000</TotalSize>
    <TechnologyDescription>1 Northern Power Systems Northwind 100 kW                                                                                                                                                                                                                      </TechnologyDescription>
    <ProjectType>Customer Sited (100 kW+)                          </ProjectType>
    <Status>Operating                                         </Status>
    <CommissionDate>2009-07-02T00:00:00-06:00</CommissionDate>
    <Discussion>&lt;p&gt; In August 2009, Woods Hole Research Center, with its developer, Sustainable Energy Developments, Inc. installed Cape Cod's second Northwind 100 wind turbine at its Falmouth headquarters. The Center is a LEED certified Green Building with solar panels and a geothermal system. &lt;/p&gt;</Discussion>
    <LastUpdated>2010-01-18T00:00:00-07:00</LastUpdated>
    <NEWF>true</NEWF>
    <Schools>false</Schools>
    <EducationalPrograms>false</EducationalPrograms>
    <Latitude>41.5492</Latitude>
    <Longitude>-70.6434</Longitude>
    <CountryName>United States                                                                                       </CountryName>
    <StatusDisplay>Operating                                         </StatusDisplay>
  </ITEM>
</ITEMS>
