Skip Navigation to main content U.S. Department of Energy Energy Efficiency and Renewable Energy
Bringing you a prosperous future where energy is clean, abundant, reliable, and affordable
Wind & Hydropower Technologies Program
About the ProgramProgram AreasInformation ResourcesFinancial OpportunitiesTechnologiesDeploymentHome
New England Wind Forum

 

EERE Information Center

News

Wind Powering America Update

August 20, 2009

Careers in Wind Energy

July 23, 2009

DOE Report Analyzes a Path to Reaching 20% Wind Power by 2030

May 12, 2008

Federal Grant Fully Funds Small Turbine Installation at Maine Senior Housing Complex
(PDF 541 KB)
Download Adobe Reader

January 17, 2008

Jiminy Peak Mountain Resort Wind Turbine

August 15, 2007

More News

Subscribe to EERE News Updates

Events

EBC New Hampshire Chapter Stimulus Forum: Funding Opportunities for Environment, Energy, and Transportation Projects

November 20, 2009

Rhode Island Ocean Special Area Management Plan Stakeholder Meeting

December 1, 2009

AWEA Offshore Wind Project Workshop

December 2, 2009

More Events

Publications
generic image for publication

Community Wind Case Studies
(PDF 1.9 MB)
Download Adobe Reader

November 17, 2009

The cover of the publication

Federal Wind Energy Assistance through NREL
(PDF 633 KB)
Download Adobe Reader

September 29, 2009

More Publications

Features
Sign up for the New England Wind Forum Newsletter.

New England Wind Forum

About the New England Wind Forum

Historic Wind Development in New England
First Large Scale Windmill
1970s OPEC Oil Embargo Sparks Renewed Interest
Age of PURPA Spawns the Wind Farm
An Industry in Transition
More New England Wind Farms
Modern Wind Turbines
History Wrap Up

State Activities

Projects in New England

Building Wind Energy in New England

Newsletter

Perspectives

Events


Bookmark and Share

Historic Wind Development in New England: Grandpa's Knob

Wind Turbine on Grandpa's Knob, VT. Photo courtesy of Rutland Herald.

Wind Turbine on Grandpa's Knob, VT. Photo courtesy of Rutland Herald.

The first large-scale electricity-producing windmill (the world's largest at the time) was installed in 1941 at Grandpa's Knob, on the border of Castleton and West Rutland, VT, to take advantage of New England's strong wind energy regime. Several companies collaborated on the turbine: S. Morgan Smith of Pennsylvania financed the project; Palmer C. Putnam executed the design; and General Electric, the American Bridge Co., the Budd Co. and Wellman Engineering also participated. Among the electric companies declaring interest in the project was Central Vermont Public Service, whose president believed wind power to be the wave of the future.

Engineers hurried the prototype into production without a customary degree of testing to complete fabrication before parts became scarce due to the looming threat of war. A news release announcing commissioning suggested that wind power could play a role in securing the nation's electric facilities as the United States moved toward entering the war: "with an eye to national defense, they [engineers] also say that a series of such wind turbines, distributed through the hills, would be less vulnerable to air attack than equivalent generating capacity concentrated in a single station."

Installation of the 240-ton edifice on the nearly 2000-foot summit presented several challenges, the most serious of which was the 43-ton pintle girder rolling off its trailer while being pulled uphill around a hairpin turn, causing it to wedge in a rock crevasse. It took workers three weeks to free it.

After nearly two months of testing the 1,250-kW turbine atop the 110-foot tower, full operation generating electricity to the power grid commenced October 19, 1941. According to the Rutland Herald, "Over the next 18 months, the experimental wind turbine operated more than 1,000 hours. Engineers corrected various flaws in the system and made minor repairs of cracks in the blades. The blades churned out electricity in winds of 70 miles per hour and withstood gales of 115 mph. The eventual goal was to make the turbine a totally automatic operation requiring no on-site staff. In February 1943, wind generation ground to a halt as a main bearing failed. Since the country remained in the midst of war, a replacement part took more than two years to manufacture and install." The turbine restarted on March 3, 1945 and operated normally until March 26, when the turbine suffered a massive failure. One of the 75-foot blades suddenly snapped off and hurled 700 feet down the mountain, while the remaining blade (now off-balance) damaged the turbine tower. The failure was blamed on the lengthening of a concealed old crack at the root of the turbine blade. The experiment, still largely considered a success, ended with the turbine being razed in the summer of 1946.

Source: "Breezin' through History", an article published in the Rutland Herald According November 4, 2004. For more information, see Power from the Wind, by P. C. Putnam.

View a film clip of Smith-Putnam turbine in action.

History content contributors include Harley Lee of Endless Energy, James Manwell of the University of Massachusetts Renewable Energy Resource Laboratory, and Tom Gray of American Wind Energy Association. Edited by Bob Grace, Sustainable Energy Advantage, LLC.

 

 