Transmission, Interconnection, and Integration Issues Webinar

Transmission, Interconnection, and Integration Issues Webinar

Date: 5/19/2010

Contact: Ryan Harry, BCS Inc.

Phone: (303) 425-6800

Before wind turbines can be interconnected to the distribution system, developers must consider interconnection costs, standards, and a host of engineering issues. Learn from case studies how wind farms handle such challenges as voltage regulation during operation, voltage flicker during start-up and generator switching, operation of substation and line voltage regulators, and protecting the distribution grid and wind turbine during grid disturbances.

Audio and text versions of the Webinar are available (WMV 26.5 MB) Download Windows Media Player. Time: 01:45:07. Text Version.