Transmission, Interconnection, and Integration Issues Webinar
Transmission, Interconnection, and Integration Issues Webinar
Date: 5/19/2010
Contact: Ryan Harry, BCS Inc.
Phone: (303) 425-6800
Before wind turbines can be interconnected to the distribution system, developers must consider interconnection costs, standards, and a host of engineering issues. Learn from case studies how wind farms handle such challenges as voltage regulation during operation, voltage flicker during start-up and generator switching, operation of substation and line voltage regulators, and protecting the distribution grid and wind turbine during grid disturbances.
Audio and text versions of the Webinar are available (WMV 26.5 MB) Download Windows Media Player. Time: 01:45:07. Text Version.
This information was last updated on August 09, 2011