• Printable Version
  • Bookmark and Share

Systems Performance Analyses of Alaska Wind-Diesel Projects; Selawik, Alaska

Systems Performance Analyses of Alaska Wind-Diesel Projects; Selawik, Alaska

File: Systems Performance Analyses of Alaska Wind-Diesel Projects; Selawik, Alaska

Date: 4/30/2009

Location: AK

The power system, which is owned by Alaska Village Electric Cooperative, connects the four wind turbines to a 1,660-kW, three-engine diesel system.

This information was last updated on October 21, 2011