Systems Performance Analyses of Alaska Wind-Diesel Projects; Selawik, Alaska
Systems Performance Analyses of Alaska Wind-Diesel Projects; Selawik, Alaska
File: Systems Performance Analyses of Alaska Wind-Diesel Projects; Selawik, Alaska
Date: 4/30/2009
Location: AK
The power system, which is owned by Alaska Village Electric Cooperative, connects the four wind turbines to a 1,660-kW, three-engine diesel system.
This information was last updated on October 21, 2011